Hello All,
We have a 140,000 SF shell & Core project that is mixed use 1st floor and office space floors 2-6. We are using LEED 2009 C&S. Can a dumpster/compactor in a service area outside, but within the LEED boundary suffice for this prerequisite? The dumpster is about 50' outside the building. Do we still need to identify an interior space?