I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date.

If our plans do not include ref equipment, are we still able to receive points for this credit? What is required to submit for certification if we do not have this equipment included in the drawings?

Thanks.