Log in
Forum » Canada
Topic

Achieving credit in a Rest Area

NC-v4 LTc7: Reduced parking footprint
posted by Julie Hardy on Jun 19, 2018, 11:50 am

The provincial government is designing a Rest Area for an important Highway, the project will also is to be operated and owned by the provincial government. There is no local code requirement for...

Option 2 Budget Calculation- Mechancial Adhesives and Sealants

CI-v4 EQc2: Low-emitting materials
posted by Gina Rahmann on Sep 21, 2017, 11:42 am

If pursuing the budget calculation method, how do you capture the layer surface area for mechanical products such as duct...

Last reply: Rebecca Aarons-Sydnor, Jun 14, 2018, 4:17 pm

SSp2 Ruling based on Risk Assessment

Healthcare-v4 SSp2: Environmental Site Assessment
posted by Donal Dignan on Jun 6, 2018, 5:30 pm

Hi All, I'm working on a Healthcare v4 project that has detected iron in significant concentrations on the project site and it appears to possibly be a background contaminate but this is still...

Exterior Noise Monitoring- Rural Roads

Schools-NC-v4 EQp3: Minimum acoustic performance
posted by Leanne Conrad on May 30, 2018, 1:55 pm

In building a rural school, our address is technically a...

Excluding adjacent park from LEED Boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Chad Thurlow on May 30, 2018, 11:43 am

Hello

I dealing with a project where an adjacent park mostly made of turf grass is being installed beside the building going for certification. Both the building and the park are owned by...

Option 2- No parking

NC-v4 SSc5: Heat Island Reduction
posted by Julie Hardy on Jan 25, 2018, 4:13 pm

Hello everyone,

I am working on a project in which we plan to pursue option 1 of the Heath Island Reduction credit. We were wandering if the project would be admissible to option 2 as well...

Last reply: emily reese moody, May 23, 2018, 8:36 pm

Scope only includes lighting

CI-v4 EAp2: Minimum Energy Performance
posted by Elizabeth Hand on May 16, 2018, 1:00 pm

Hi,

We have a CI renovation for a portion of a larger...

Last reply: Marcus Sheffer, May 21, 2018, 10:06 am

Dual Flush Flow Rate

NC-v4 WEp2: Indoor water use reduction
posted by Leanne Conrad on May 10, 2018, 4:08 pm

We have a product data sheet for a dual flush toilet that states 6L/3L with an effective flush volume of 4L. The Indoor Water Use calculator has an internal calculation for dual flush toilets...

Last reply: Nathan Gauthier, May 16, 2018, 9:54 pm

Landscaped area on a podium

NC-2009 WEc1: Water Efficient Landscaping
posted by Lindsay Duthie on Apr 30, 2018, 5:53 pm

My project consists of some landscaping at grade (2%) and the majority of landscaping on the podium level (18%) for a combined landscaped area that is about 20% of the site. 

The exert...

Last reply: Jens Apel, May 2, 2018, 2:21 am

Removal of parking = EP??

NC-v4 LTc7: Reduced parking footprint
posted by Cora Kenrick on Apr 30, 2018, 12:09 pm

Hi Fellow Users,

I'm looking for some help.

Our new construction is being built on existing parking, therefore there is removal of some carp parking spaces. No additional parking is...

Last reply: Cora Kenrick, Apr 30, 2018, 4:41 pm