2 Buildings in the same lot

CS-2009 MPR3: Must use a reasonable site boundary
posted by Guillermo Alonzo on Jun 28, 2017, 5:40 pm

Hello from Colombia,

We have a C&S Project that has two different buildings (Hotel and offices building) in the same boundary. They share only three underground level parking garages...

Projects constructed by diferent owners, same property managment

LEED Guidance for Campuses and Multiple Buildings
posted by Pedro Urazan on Apr 27, 2017, 12:45 pm

Hi,
A land owner wants to develop 2 buildings in a section of his terrain and wants to sell the rest of the parcels. He wants to develop a master site to certify his 2 buildings but he...

Last reply: Eric Anderson, May 5, 2017, 6:07 pm

Offsite donation compensation

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Cesar Ruiz on Apr 26, 2017, 11:09 am

I have a project with a large previously developed area. It will have several green roofs with different native species but the total green area onsite will not be enough to comply with the...

Last reply: April Brown, Apr 27, 2017, 2:29 pm

Lighting Power Density requirement for Tenant spaces

CS-2009 EAp2: Minimum Energy Performance
posted by Pedro Urazan on Apr 20, 2017, 5:15 pm

Hi,
Is it required that the Tenants comply in their lighting designs with the Lighting Power Density requirement of ASHRAE 90.1 2007?

Or is it just for energy modeling purposes...

Last reply: Marcus Sheffer, Apr 21, 2017, 10:06 am

Vegetation under solar panels

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Cesar Ruiz on Apr 11, 2017, 9:10 am

Hello,
We are working on a project which is going to have almost all of its roof covered by solar panels. However, is very important for the project owner to achieve also the protect or...

Last reply: Tristan Roberts, Apr 11, 2017, 4:05 pm

LEED V4 Rating System: Game Arcade

LEED Rating System Selection
posted by MKK LEED on Feb 3, 2017, 8:35 am

Hi All,
We are working on a C&S Mall Project, and one of the tenants wants to certify they space, their space is going to be a game arcade with some small attractions (bumper cars and...

Last reply: Tristan Roberts, Feb 3, 2017, 1:46 pm

Ventilation Rates for a Dental Office

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Cesar Ruiz on Nov 2, 2016, 3:07 pm

Hello LEEDuser community,

We're working on an innovation and wellness center which, among different types of spaces, has a Dental Office in which small procedures will be performed.

...

Last reply: Michael Brown, Jan 27, 2017, 12:00 pm

Buildings w/ programmatic dependency/architectural cohesiveness

CS-v4 MPR2: Must use reasonable LEED boundaries
posted by Ricardo Sá on Nov 23, 2016, 7:11 am

I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED...

Last reply: Tristan Roberts, Jan 17, 2017, 3:09 pm

Diverse uses located within LEED project boundary

CS-v4 LTc6: Bicycle facilities
posted by Ricardo Sá on Nov 22, 2016, 12:34 pm

I'm working on a shopping center development that will include at time of occupancy more than 10 diverse uses within project boundary. May we count this uses to comply with the...

Last reply: Marilyn Specht, Jan 17, 2017, 2:56 pm

Open mall shopping centre baseline model

CS-v4 EAp2: Minimum Energy Performance
posted by Ricardo Sá on Nov 25, 2016, 6:57 am

I'm currently working in a project of a shopping centre (common areas + tenant areas) pursuing LEED certification (Core&Shell).

This shopping center mall is an open-mall type (i.e.,...

Last reply: Marcus Sheffer, Nov 28, 2016, 11:53 am