LEED O&M on a portion of a buildingEBOM-v4 MPR3: Must comply with project size requirementsposted by LEED Pro Consultant on Jan 14, 2015, 7:12 pm
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification? A single entity owns the... Last reply: Tristan Roberts, Jan 17, 2017, 1:05 pm |
|
10% exemptionEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on May 17, 2016, 6:41 pm
Is it allowed to exclude up to 10% of spaces from this prerequisite? Our project is a 20-story building that complies with the ventilation rates but there is an office in the core that... Last reply: Michael Smithing, Jan 16, 2017, 7:27 pm |
|
BMSEBOM-2009 EAc2.3: Existing building commissioning - ongoing commissioningposted by Gustavo De las Heras Izquierdo on Dec 23, 2016, 12:58 pm
Hallo, We are working on two projects located in Mexico DF. One of them doesn't have a BMS and the other has a BMS but it does not provide trend graphs. Are these projects eligible for... Last reply: Scott Bowman, Jan 12, 2017, 6:05 pm |
|
Definition of LandfillNC-2009 MRc2: Construction Waste Managementposted by Adrian Arenas on Nov 28, 2016, 7:13 pmon this forum regarding mine rehabilitation? Open http://www.leeduser.com/credit/NC-2009/MRc2?all-comments=true in your browser and then search for mine. One in particular to look... Last reply: RETIRED, Dec 27, 2016, 12:23 pm |
|
Pedestrian access- Community connectivityCS-2009 SSc2: Development Density and Community Connectivityposted by Maria Isabel Conde on Dec 22, 2016, 4:47 pm
Hello, Last reply: Allison Smith, Dec 22, 2016, 5:40 pm |
|
HVAC Appropriate Zoning and ControlCI-2009 EAc1.3: Optimize energy performance - HVACposted by Gabriela Crespo on Aug 5, 2016, 12:35 pm
Dear all, We are working on a Commercial Interiors project, where there is a... Last reply: Bazeeth Ahamed K M, Nov 29, 2016, 12:56 am |
|
Appendix G OversizingCS-2009 EAc1: Optimize Energy Performanceposted by Jorge Torres-Coto on Sep 19, 2016, 12:45 pm
I have a reviewer requesting that we oversize the PROPOSED case for a "possibly conditioned in the future" warehouse. Last reply: Marcus Sheffer, Sep 19, 2016, 1:00 pm |
|
Waste Material reused "on-site"NC-2009 MRc2: Construction Waste Managementposted by Adrian Arenas on Jul 28, 2016, 2:17 pm
Construction Waste Management- Regarding waste material reused on site, our project is currently reusing... Last reply: RETIRED, Aug 19, 2016, 5:00 pm |
|
TenantsEBOM-2009 IEQc2.3: Occupant comfort - thermal comfort monitoringposted by Gustavo De las Heras Izquierdo on Jul 1, 2016, 2:09 pm
Does anyone know if all the tenants need to be included in this credit? We are working on a 70-tenants office building and I guess it will be difficult to coordinate with all of them. Is... Last reply: Ben Stanley, Aug 19, 2016, 12:48 pm |
|
Frequency of rides per day that have to be given by the shuttleNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Jorge Lopez de Obeso on Aug 9, 2016, 2:02 pm
We are working on a project in which the nearest bus stop is just over a quarter mile so it is proposed to provide a shuttle service to take users to the bus stop. The question is what should be... Last reply: Marilyn Specht, Aug 14, 2016, 8:30 pm |