Forum quick links
High-Reflectance Roof
NC-v4 SSc5:Heat island reductionposted by Cora Kenrick on
Hi Fellow LEED Users,
Am I correct in saying that for a High-Reflectance Roof, a roof full of PV can not be consider? As SRI works different with PV.
mindful Materials -- contractor working group participation request
posted by Jennifer Taranto on
Lauren Shumaker (Turner Construction) and I are starting a group to focus on improving the submittal process, currently focused specifically on healthy & sustainable materials and the use of th
Define "Weekend Trips
CS-v4 LTc5:Access to quality transitposted by Susan Di Giulio on
We are working on an Office Tower in the center of Salt Lake City.
foundation walls and footings
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Ilana Judah on
How are these calculated for this credit? As a continuation of the exterior wall? Thanks.
Area not in scope of project
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Carl Rappa on
We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2.
Requirements of section 5.4.3.4 of ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Maurizio Sabatino Pirocchi on
Hi,
I have a question concerning requirements of section 5.4.3.4 of ASHRAE 90.1-2007.
U-values for mixed-use building
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For the baseline model relative to a building where a part is residential (4 floors) and another part nonresidential (ground floor), shall the envelope of the nonresidential part respect the U-valu
Option 2 - Inherently - back-up documentation?
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
For factory-finished metal products and glazing, does one have to include supporting documentation?
Wet Applied Products Volume
NC-v4 EQc2:Low emitting materialsposted by Tommy Linstroth on
The calculator USGBC provides for this credit make it appear that the volume is required for ALL products, regardless of if you are doing a budget or if projects all meet VOC limits.
Bicycle storage
Homes-v4 LTc2:Site selectionposted by Gustavo De las Heras Izquierdo on
Hallo everybody,
The credit language says: