Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
5
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Jul 26, 2018, 8:27 pm

Paints for Artwork

CI-v4 EQc2:Low emitting materials
posted by  Felicity Lee  on 

Hi All,

I have a small office project where we are going to do wall artwork and to be painted by artists on-site. 

0

MRc4 Calculator asks me for a password

NC-2009 MRc4:Recycled Content
posted by  Monica Wilson  on 

Does anyone else experience this happening in their excel spreadsheet? I am able to download the 2009 calculator from the USGBC, and fill out info for MRc4.

0

Blower Door Test for Residential Units

NC-v4 EQp2:Environmental tobacco smoke control
posted by     on 

If a residential project has 4 floors of condos that allow smoking above 5 floors of apartments that do not allow smoking, does there need to be a blower door test performed for every unit, or just

0

Regularly occupied space that has high bay lighting fixtures but needs to comply with Strategy D

NC-v4 EQc6:Interior lighting
posted by  Edgar Arevalo  on 

There is a garage space that acts as an auto service bay (regularly occupied space) but has a high ceiling installed with high bay lighting fixtures.  After weighing all other options, no othe

0

New Wood Invoices

NC-2009 MRc7:Certified Wood
posted by  Bobby White  on 

Hi everyone. I've been getting requests for invoices to be submitted along with the 'new wood' stating costs.

5
Thu Jul 26, 2018, 1:13 pm

Diverse Uses Access

Schools-NC-v4 LTc4:Surrounding density and diverse uses
posted by  Lou Niles II  on 

Hello I'm looking for feedback from people with Rural projects OR projects in cities but in Unincorporated Areas in the United States, These areas often do not have sidewalks and I am wondering if

0

Storm Interval and Drawdown

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Leandro Silva  on 

Thank you for all of the information provided on this forum. I am confident in all of our calculations up to the Storm Interval and Drawdown calculations.

12
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jul 25, 2018, 9:52 pm

Phase Change Material deployable partitions?

Green Commons
posted by  Alejandra Menchaca  on 

Have any of you heard of anyone ever using phase change material (PCM) "movable partitions" as a resiliency strategy to mitigate indoor overheating during a heat wave

6
Default Avatar
Chief Sustainability Officer
Cuningham Group
LEEDuser Premium Member
0 thumbs up
Wed Jul 25, 2018, 7:32 pm

Temporary modular building

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Isabelle Arnold  on 

Our project site includes an existing lab building as well as a modular building (essentially a large trailer) that is temporarily housing expansion of the lab until a new lab building is adde

1
Wed Jul 25, 2018, 8:01 pm