Forum quick links
Paints for Artwork
CI-v4 EQc2:Low emitting materialsposted by Felicity Lee on
Hi All,
I have a small office project where we are going to do wall artwork and to be painted by artists on-site.
MRc4 Calculator asks me for a password
NC-2009 MRc4:Recycled Contentposted by Monica Wilson on
Does anyone else experience this happening in their excel spreadsheet? I am able to download the 2009 calculator from the USGBC, and fill out info for MRc4.
Blower Door Test for Residential Units
NC-v4 EQp2:Environmental tobacco smoke controlposted by on
If a residential project has 4 floors of condos that allow smoking above 5 floors of apartments that do not allow smoking, does there need to be a blower door test performed for every unit, or just
Regularly occupied space that has high bay lighting fixtures but needs to comply with Strategy D
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
There is a garage space that acts as an auto service bay (regularly occupied space) but has a high ceiling installed with high bay lighting fixtures. After weighing all other options, no othe
New Wood Invoices
NC-2009 MRc7:Certified Woodposted by Bobby White on
Hi everyone. I've been getting requests for invoices to be submitted along with the 'new wood' stating costs.
Diverse Uses Access
Schools-NC-v4 LTc4:Surrounding density and diverse usesposted by Lou Niles II on
Hello I'm looking for feedback from people with Rural projects OR projects in cities but in Unincorporated Areas in the United States, These areas often do not have sidewalks and I am wondering if
Storm Interval and Drawdown
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Leandro Silva on
Thank you for all of the information provided on this forum. I am confident in all of our calculations up to the Storm Interval and Drawdown calculations.
Phase Change Material deployable partitions?
posted by Alejandra Menchaca on
Have any of you heard of anyone ever using phase change material (PCM) "movable partitions" as a resiliency strategy to mitigate indoor overheating during a heat wave
Temporary modular building
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Isabelle Arnold on
Our project site includes an existing lab building as well as a modular building (essentially a large trailer) that is temporarily housing expansion of the lab until a new lab building is adde