Log in
Forum » Asia – South and Southeast
Topic

use density planning map

NC-v4 LTc4: Surrounding density and diverse uses
posted by ed HvacSimulator on Nov 22, 2021, 6:00 am

Hi all!

we have a building in a high...

Ventilation design-worst case conditions

CI-2009 IEQp1: Minimum indoor air quality performance
posted by S Nagarajan on Jan 23, 2015, 10:17 am

How to provide a narrative to explain how the worst-case condition was determined considering the total design airflow rate at the condition analyzed

Last reply: Apoorva Pradhan, Nov 19, 2021, 1:15 pm

Industrial park can be considered as the previously developed site?

Warehouses-NC-v4 LTc4: Surrounding density and diverse uses
posted by Vang Le Luong on Dec 1, 2017, 4:13 am

A new project in the industrial park, which was altered by agriculture use, can be achieved Option 1 of LTc4?

Thanks alot for your respond

Last reply: Hashir Usman, Nov 2, 2021, 8:09 am

Green Power Query

NC-v4 EAc7: Green power and carbon offsets
posted by Andrei Sabater on Mar 18, 2020, 12:30 am

I am Andrei Sabater, employee of ecoSolutions, Right now we are currently studying the credit for the...

Last reply: Olga Yuil, Sep 6, 2021, 4:04 pm

How to identify nonattainment areas for projects outside of the US/Canada?

NC-v4 EQp1: Minimum indoor air quality performance
posted by Guillaume FABRE on Jul 21, 2020, 2:00 am

Hi all, I am pretty clear about the definition of nonattainment area given in ASHRAE 62. This being said, how to identify nonattainment areas for projects outside of the US/Canada? Are you aware...

Last reply: Afogreen Build, Aug 26, 2021, 8:14 pm

Can we consider the cafe yard as an open space?

NC-v4 SSc3: Open space
posted by Dzu Pham on Jun 11, 2021, 12:45 pm

Hello, 

I have a question. 

Our project have a cafe space outdoor. Can we consider it as an open space? Can you give me some suggestion? 

Thanks and regard! 

Last reply: Afogreen Build, Jul 22, 2021, 4:34 am

Japanese F Four Star system for Low-VOC flooring?

NC-v4 EQc2: Low-emitting materials
posted by Timothy Ian Middleton on Jun 21, 2021, 11:43 pm

I am based in Asia and here many Japanese flooring products have "F Four Star" Certification. An "F Four Star Product" will have a maximum average formaldehyde emission of 0.3mg/L based on  but...

Last reply: Timothy Ian Middleton, Jul 1, 2021, 5:23 am

Product meeting multiple MRc4 methodologies

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Van Jomel Garcia on Jun 13, 2021, 9:41 pm

Hi! Has anyone encountered a product that complies with more than one compliant MRc4 Methodologies? We've purchased a product that has a Declare (3rd party reviewed) certificate and a Cradle-to-...

Last reply: Bipin Karki, Jun 15, 2021, 8:05 am

Different LEED certification level for 1 building but 2 uses. Is it possible?

LEED Guidance for Campuses and Multiple Buildings
posted by Panita Varaurairat on Mar 5, 2019, 8:16 am

For the mixed-uses building (Podium as a retail & tower as an office),

1) Can we apply for 2 LEED rating system? (LEED NC for retail & LEED CS for office)

2) Can we apply...

Last reply: Susan Di Giulio, Jun 2, 2021, 2:37 pm

Tenant lighting fixtures installed but not wired up

CS-v4 EAp2: Minimum Energy Performance
posted by Varunya Jarunyaroj on May 27, 2021, 12:33 pm

The owner of our LEED V4 CS project plan to provide lighting fixtures on the ceiling grid in the tenant space; however, they the wiring and control will be done by tenants due to different leased...

Last reply: Marcus Sheffer, May 27, 2021, 3:07 pm