Topic | Recent |
---|---|
Pilot-Credits EQpc57: Enhanced acoustical performance- exterior noise controlPilot-Credits EQpc57: Enhanced acoustical performance - exterior noise controlposted by Olawale Taiwo on Jan 12, 2024, 12:45 pm
Hello Sound & Acoustic Specialist (LEED APs), Please I need a quick confirmation on this Pilot credit EQpc57. Does this Pilot credit EQpc57, still apply to LEED v4.1 BD+C:NC... Last reply: Beatriz Sturm, May 20, 2024, 10:28 am |
|
Protect and Restore Biodiverse HabitatLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Chantal Carius on May 18, 2024, 7:04 am
I think to have 15 native or adapted species as a baseline is a great asset. Also think that the credit should specify the importance of not to importing soil from forests or nature, but... |
|
Planning Zero Waste OperationsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Chantal Carius on May 18, 2024, 7:07 am
It seems that maybe an education scope in this prerequisite is needed to achive the Zero Waste and threshold also seems to be needed as the prerequisite only speaks of "attempting" zero waste... |
|
Assess Embodied Carbon/ Reduce embodied carbonLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Chantal Carius on May 18, 2024, 7:09 am
Not sure where the reference Table of the prerequisite comes from. For the... |
|
Optimize building product BD+C and CSLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Chantal Carius on May 18, 2024, 7:11 am
|
|
Construction and Demolition Waste ReductionLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Chantal Carius on May 18, 2024, 7:14 am
This credit should be attempting zero waste management in construction. Seems to me that this credit is less demanding than the prerequisite of Planning for Zero Waste Operations and shouldn't be... |
|
Minimized Site DisturbanceLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Chantal Carius on May 18, 2024, 7:21 am
This prerequisite is a great goal to achieve. |
|
The Thermal Environment Credit Category Needs AttentionLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Chris Mackey on May 18, 2024, 3:45 pm
I’m glad to see that the new standard includes a reference to a specific known problem of thermal comfort (overcooling) and the ASHRAE-55 section on it but I am overall very disappointed that... |
|
Sound Environment and Occupant ExperienceLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Projetos Giner on May 17, 2024, 11:04 am
The LEED mission, as stated in the Strategic Plan, is to ensure that buildings create spaces that promote human and environmental well-being, including designing healthier and safer environments... Last reply: Chris Mackey, May 18, 2024, 3:34 pm |
|
Arbitrage optionCS-v4 EAc5: Renewable energy productionposted by Glen Boldt on May 17, 2024, 7:09 pm
When using the "arbitrage" option, is there a limit regarding where, geographically, the replacement RECs can be purchased form? Within the USA, do they need to be purchsed from a renewable... Last reply: Marcus Sheffer, May 17, 2024, 7:35 pm |