Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Equity & Community Benefits

NC-v4.1 LTc3:High Priority Site and Equitable Development
posted by  Xavier Mora  on 

Hello,

to obtain the point of this credit, how does it need to be this equity plan? For who do I need to design?

Should we implement to the neighborhood this plan?

7
Architect & Sustainablity Consultant
LEEDuser Basic Member
0 thumbs up
Sat Sep 27, 2025, 11:51 am

Overall credit experience

Pilot-Credits EQpc116:Daylight in nonregularly occupied spaces
posted by  Valeria Fiorentino  on 

As the project was already pursuing Daylight credit we have been able to use the same simulation tool for this piot credit.

6
Default Avatar
SUSTAINABILITY CONSULTANT
NTT DATA
LEEDuser Basic Member
0 thumbs up
Wed Sep 17, 2025, 12:07 pm
5
Tue Aug 19, 2025, 5:31 am

EQpc123 Designing with nature

CS-v4 INc1:Innovation
posted by  Triple Green Building Group  on 

I have been documenting this as an innovation for a long time, but now attempt it as a pilot credit for a first time due to the requirement to have at least one pilot credit for the total 5 points.

0

Points relative to Appliance and Process Water

NC-v4 WEc2:Indoor water use reduction
posted by  Francesco Passerini  on 

As project team, we are involved in a NC project.

1
Default Avatar
Junior HVAC Design Engineer - Sustainability
PNC Architects
LEEDuser Basic Member
2 thumbs up
Thu Jul 24, 2025, 7:13 am

Exhaust rate Table 6.5 ASHRAE 62.1 Clarifications for toilets

NC-v4.1 EQp1:Minimum Indoor Air Quality Performance
posted by  Alessandro Zuanon  on 

Dear all,

some questions about exhaust flow rates to be used for toilets form table 6.5 of ASHRAE 62.1:

0

Outdoor Air when Baseline has System 2

NC-v4 EAp2:Minimum energy performance
posted by  Greenlab   on 

I am following v4 and ASHRAE 90.1 - 2016.

I have an Hotel in Climate Zone 3A, therefore I am using System 2 (PTHP) for Baseline.

8
Default Avatar
Managing Partner
Engineering Solutions
LEEDuser Basic Member
0 thumbs up
Thu May 8, 2025, 3:44 pm

LEED project boundary

CS-v4 MPR2:Must use reasonable LEED boundaries
posted by  Francesco Passerini  on 

The site area of our project has some differences between ground floor and the basement: the basement area is higher than the ground floor area.

3
Wed Apr 9, 2025, 2:58 pm

Luminance of less than 2,500 cd/m2 between 45 and 90 degrees from nadir

NC-v4 EQc6:Interior lighting
posted by  Henri Barten  on 

Hello, i'm new into the LEED requirements.

My customer ask me if we have light fixtures with a luminance of less than 2,500 cd/m2 between 45 and 90 degrees from nadir.

7
Thu Apr 3, 2025, 6:47 pm