Forum quick links
Water Requirement of Landscape Plants
NC-v4 WEp1:Outdoor water use reductionposted by Rodolfo Loro, Jr. on
Hello. I have a project that has no landscape consultant, so the architects are asking for assistance in choosing plants that will help us meet the 30% to 50% outdoor water reduction.
how can I calculate actual cost of Material and resource part?
posted by mohamed nur hashi on
I am university student and I am writing my thesis about leed certification, especially cost materials.
PROJECTION FACTORS FOR VERTICAL FINS
CS-v4 EAp2:Minimum energy performanceposted by Fotis Kotsopoulos on
Dear all,
Is it possible to correlate vertical fins with projection factors shown in table 5.5.4.4.1 ASHRAE 90.1-2010?
FK
Entryway System in TSLA
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Brightworks Sustainability on
My CS v4 project wants to pursue Enhanced IAQ Strategies but we are not responsible for installing entryway systems or walk-off mats.
Thermal Comfort Control - Open Office Area
NC-v4 EQc5:Thermal comfortposted by on
We are working on a new media center for a University in Hawaii. In our second review, we were asked to list out individual workstations in our only Individual Occupant Space, rather than the
WE Prerequisite 1
EBOM-v4 WEp1:Indoor water use reductionposted by Alice Andersen on
I have a lavatory faucet that are automatically controlled (sensor control) and a flow rate of 5 l per minute. In accordance to the LEED manual the baseline is 1.9 l per minte.
C+S Building removing HVAC scope
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Karina Hanyzewski on
Hi there!
Qualifying compliance to Extreme Heat design parameters
Pilot-Credits IPpc99:Design for Enhanced Resilienceposted by Jolene McLaughlin on
Does anyone have a view of what would qualify to meet some of the subjective requirements in the Extreme Heat design measures?
No separate meter for water performance
EBOM-v4 WEc4:Water meteringposted by Phung NGUYEN on
Our Office located in a group building of manufacturing was having one main meter that measures the total potable water.
Mixed-use in LEED Core & Shell
posted by Anke Koch on
Hi, our project is a new mixed-use building (residential / retail / offices) in the center of Berlin, Germany.