Question regarding Occupancy sensorNC-v4 EAp1: Fundamental commissioning and verificationposted by Nagaraj Sankar on Dec 29, 2022, 6:47 am
How can we show and prove, here are the palces we gave an ocupancy and daylight sensor for manufacturing project? and Is there gudelines used to follow to place sensor on our drawings ? kindly... |
|
asking about thermal comfortNC-v4.1 EQc5: Thermal comfortposted by Nagaraj Sankar on Dec 16, 2022, 8:01 am
Hi all, In thermal comfort how can we achieve the 1 point by proving that controls (Air temperature, Air speed, Thermostat, operable windows) which we given in regular spaces in Both V4... Last reply: Nagaraj Sankar, Dec 18, 2022, 11:16 pm |
|
Does LEED require a third-party to verify the LCA report?NC-v4.1 MRc1: Building life-cycle impact reductionposted by Michael on Aug 18, 2022, 5:52 am
My project is using One Click software to do LCA report. I would like to ask if LEED requires an independent professional (from One Click for example) to verify our LCA report before we submit it... Last reply: Sagar Siripuram, Nov 8, 2022, 1:37 am |
|
Is it ok if we choose CO2 Sensors with fixed default setpoints from the manufacturer?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by ed HvacSimulator on Nov 6, 2022, 10:00 pm
Hi, We are following Leed V4 for New Construction. It is difficult to find the CO2 sensors for crowded... |
|
Indoor Water Use Reduction Calculator v4.0NC-v4.1 WEp2: Indoor water use reductionposted by Dung Bui on Sep 4, 2019, 11:05 pm
Hi everyone, I'm currently working on the credit Indoor Water Use Reduction (Calculator 4.0 excel sheet) and have a question concerning fixture's design flow rate. The fixtures used... Last reply: emily reese moody, Oct 17, 2022, 12:50 pm |
|
Problem with Rainfall Event CalculatorNC-v4 SSc4: Rainwater managementposted by Timothy Ian Middleton on Oct 5, 2022, 4:29 am
We have just realised that the percentile value given by the LEED Rainfall Event Calculator (https://www.usgbc.org/... Last reply: Gustavo De las Heras Izquierdo, Oct 5, 2022, 1:03 pm |
|
District Cooling SystemsNC-v4.1 EAp2: Minimum Energy Performanceposted by Mark Anthony Ver on Aug 18, 2022, 2:41 am
We are using the path for the EA Prerequisite 2 (Minimum Energy Performance),Performance Option 1-Streamlined Path) by modeling purchased cooling from an existing District Cooling Plant. Is there... Last reply: Tyler Thumma, Oct 4, 2022, 1:32 pm |
|
Green area reserved for future building developmentNC-v4.1 SSc2: Protect or Restore Habitatposted by Michael on Aug 29, 2022, 1:50 pm
My project has 2 phases of development. Currently, we only apply LEED for phase 1. There is a big greenery area, reserved for future building in phase 2. Can we count this greenery area as a... Last reply: Kimiko Marinacci, Sep 21, 2022, 2:52 pm |
|
Pilot CreditPilot-Credits IPpc101: Integrative processposted by AMIR ZULKHAIRI AHMAD BANGI on Sep 19, 2022, 1:22 am
As per the requirements of the pilot credit, we are noting our participation in this forum. |
|
LEED O+M v4 Pilot Credit ParticipationPilot-Credits IPpc101: Integrative processposted by AMIR ZULKHAIRI AHMAD BANGI on Sep 19, 2022, 4:36 amPaula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 180 thumbs up September 19, 2022- 8:58 am Hi, Amir! I think the idea behind this requirement is that you say something about your experience with the credit to help others who may be pursuing it. I doubt "We are noting our participation in this forum" is going to count as participation. Log in or register to post comments ... Last reply: Paula Melton, Sep 19, 2022, 8:58 am |