Topic | Recent |
---|---|
Site Boundary Including Other StructuresHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Vicki Rybl on Dec 22, 2016, 1:55 pm
We are certifying a ~30K sf building that shares its site (legal parcel) with a large 8 story garage. The two structures are being designed and built on a similar timeline but ultimately the... Last reply: Tristan Roberts, Jan 17, 2017, 4:43 pm |
|
Site adjacent to 5 lane highway- with no On-0ff ramp.Warehouses-NC-v4 LTc4: Surrounding density and diverse usesposted by Joyce Kelly on Aug 11, 2016, 2:56 pm
If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a... Last reply: Tristan Roberts, Jan 17, 2017, 4:25 pm |
|
Living WallRetail-NC-v4 WEc4: Water meteringposted by Joanne Sawatzky on May 19, 2016, 4:49 pm
We have a CI project and are targeting this as an innovation credit. There is not outside space, but there is a living wall inside. Would metering the irrigation for the living wall be acceptable... Last reply: Tristan Roberts, Jan 17, 2017, 4:17 pm |
|
PV- how is it accounted for?Mid-Rise-v4 EAp1: Minimum Energy Performanceposted by sue bryant on Jul 18, 2016, 1:38 pm
I would like to confirm that PV is accounted for solely in the energy model for V4 Midrise projects. Unlike Homes, there are no credits targeting PV. Also, I see no Innovation credits. Thank you... Last reply: Tristan Roberts, Jan 17, 2017, 4:01 pm |
|
Energy performance vs. Energy CostMid-Rise-v4 EAc1: Annual energy useposted by Eesmyal Santos-Brault on Dec 13, 2016, 6:28 pm
Hi - It seems that this version of the rating system is targeting energy performance improvement over energy cost budget. Is that right? Last reply: Tristan Roberts, Jan 17, 2017, 3:58 pm |
|
Education & Outreach ID credit for v4?Hospitality-NC-v4 INc1: Innovationposted by Karen Heet on Aug 21, 2015, 3:04 pm
Howdy! Does v4 accept the ID credit Education & Outreach as the 2009 version did? Last reply: Tristan Roberts, Jan 17, 2017, 3:57 pm |
|
[Innovation Credit] Bicycle AlternativeSchools-EBOM-v4 INc1: Innovationposted by JOHN COOK on Nov 5, 2015, 6:34 pm
Hi, Last reply: Tristan Roberts, Jan 17, 2017, 3:30 pm |
|
Diverse Uses within a Shopping CenterCS-v4 LTc4: Surrounding density and diverse usesposted by Frank Sherman on Jan 16, 2017, 4:02 pm
The planned C+S development is a shopping center that will include retail, restaurants, a grocery store and movie theater. If these tenants are in place at the time of certification can they be... Last reply: Tristan Roberts, Jan 17, 2017, 3:13 pm |
|
Dorm LightingNC-2009 IEQc6.1: Controllability of systems - lightingposted by Jordan Altaras on Jan 17, 2017, 1:33 pmTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11474 thumbs up January 17, 2017- 2:45 pm That's a note on the LEED Online form? Sounds to me like it's just a handy tip and is not trying to exclude dorms. A tip like that cannot speak to all space types. In this case, a dorm room is a lot like a private office. See this earlier comment on the forum that I think speaks to the issue. Log in or register to post comments Jordan Altaras Electrical Engineer PAE Consulting Engineers LEEDuser Basic Member 1 thumbs up January 17, 2017- 3:00 pm Thanks Tristan! Yes,... Last reply: Jordan Altaras, Jan 17, 2017, 3:00 pm |
|
Interior Cross-Contamination Prevention, Industrial Curtain WallCS-v4 EQc1: Enhanced indoor air quality strategiesposted by Ashley Wisse on Feb 11, 2016, 10:36 am
Our project contains a theater scene shop including a small area where spray paint will occasionally be used. Three sides of the space are deck-to-deck partitions including an opening with one... Last reply: Tristan Roberts, Jan 17, 2017, 2:59 pm |