Forum quick links
validity of a LEED 2009 registration
posted by Melissa Merryweather on
I've been working for the past year on a suite of 3 NC projects for a client, all to be registered with LEED 2009 in the next month or so, and I've just been asked if there will be a limit to the v
Development density - just touches a building
NC-2009 SSc2:Development Density and Community Connectivityposted by Lawrence Lile on
My development density radius just touches a 92,000 square foot hotel, which will kick me over the 60,000 sq ft per acre limit.
Construction Impact Zone
posted by Sam Watters on
Hello, I am making the map of our anticpated construction impact zone, and I am wondering about development that is taking place outside of our LEED Boundary.
Specific measurement system required?
posted by Mauricio Ramirez on
I have projects in Mexico that are measured in metric plans. All my calculations have been done in imperial units, as if it's required by LEED.
Epoxy flooring system and Indoor Air Quality
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Petra Hajná on
Hi everybody! Do you have any experience or suggestions on how to deal with application of polyurethane / epoxy flooring system in underground garage floors in scope of IEQc3? Is temporary sealing
slab-on-grade floor
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In Table 5.3 point 5 of annex G of ASHRAE 90.1-2007 I find that for the baseline building performance “opaque assemblies used for new buildings (..) shall confirm with the following common lightwei
Leather
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Agustina Galli on
Hello! We are building a deluxe hotel and the interiorist is willing to use leather coating for room doors.
Tennant HVAC System Unknown
CS-2009 EAc1:Optimize Energy Performanceposted by Marco Marco on
Hi all, I am working on a whole building simulation according to Appendix G. The 10 storey building is divided on 3 tennants.
SSc8 vertical grid points
posted by Bill Swanson on
Some commentors are stating that regarding SSc8, Reviewers are asking for vertical calculation points spaced 5' apart.
CS project: How do I know the regularly occupied spaces?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Susan M. Kaplan on
Do I need to work with the tenants and base our calculations on their interior fit-out design to evaluate whether we're meeting 75% of all regularly occupied spaces?