Tenant-level energy simulation

Retail-CI-v4 EAp2: Minimum Energy Performance
posted by Iqbal K. on Mar 9, 2020, 4:58 am

Dear All,

We wish to clarify on the tenant-level energy simulation for our single floor project located within 40 floors of high rise base-building.

The cooling is sourced from the...

Last reply: Marcus Sheffer, Mar 9, 2020, 10:24 am

Squat WC using manual flushing

Warehouses-NC-v4 WEp2: Indoor water use reduction
posted by Iqbal K. on Feb 13, 2020, 4:19 am

Dear All,

We have 2 nos of squat toilet within the development for the security and driver room. However, the flushing system will be manual using bucket. 

How to justify the WC...

Last reply: emily reese moody, Feb 14, 2020, 12:21 am

LEED Core & Shell building within the LEED ND project

ND-Plan-v4 GIBp1: Certified green building
posted by Iqbal K. on Feb 1, 2020, 12:58 am

Dear All,

I have a plan LEED ND v.4 with LEED Core & Shell 2009 certified building within the masterplan. Under ND v.4, does the building still requires LEED Commercial Interior ...

Last reply: Iqbal K., Feb 5, 2020, 10:10 pm

Option 1 Requirements

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Yodi Danusastro on May 10, 2019, 7:15 am

Do we have to meet all the requirement in Option 1 as in mechanically ventilated spaces: A.the Entryway system strategy, B. Interior-cross-contamination prevention, and C. Filtration (...

Last reply: Bipin Karki, May 15, 2019, 2:13 pm

Parking spaces under tree canopy can be counted under the Option 2: Parking under cover

NC-v4 SSc5: Heat Island Reduction
posted by Thomas Tan on Feb 18, 2019, 1:55 am

Dear LEED Experts,

Our parking spaces consist of two parts: one park is under a roof...

Last reply: Thomas Tan, Mar 14, 2019, 5:33 am

Epoxy mortar for anchoring rebar in concrete

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Anna Okviana on Jul 28, 2016, 6:31 am

Hai, my project use epoxy glue for anchoring rebar from brick wall to column and slab in indoor area. Does it must meet LEED requirement for adhesive and sealant? In my opinion epoxy glue does...

Last reply: soha yamani, Dec 9, 2018, 1:45 am

Electric Charging Forklift

Warehouses-NC-v4 LTc8: Green vehicles
posted by Dick Bernadi on Sep 1, 2018, 12:18 pm

Does electric forklift accounted to get a point?

Last reply: Emily Purcell, Sep 4, 2018, 9:43 am

Timetable Data

Warehouses-NC-v4 LTc5: Access to quality transit
posted by Dick Bernadi on Sep 1, 2018, 10:31 am

How do we get the time table data? is it by our own survey or is the data usually provided by the government?

Last reply: Dick Bernadi, Sep 3, 2018, 11:14 am

Areas for Sustainable Food Farming protection

Warehouses-NC-v4 LTc3: High Priority Site and Equitable Development
posted by Dick Bernadi on Sep 3, 2018, 11:13 am

We are engaged for a production facility, we want to ensure if our site included by the land use as area for sustainable food farming protection, do we get credit?

Retention pond for Rainwater Management

Warehouses-NC-v4 SSc4: Rainwater management
posted by Dick Bernadi on Sep 2, 2018, 3:59 am

Does retention pond could be use as strategy to achieve this credit?