Topic | Recent |
---|---|
LEED EBOMPilot-Credits EQpc78: Design for active occupantsposted by Lukas Urban on Jun 10, 2015, 5:09 am
Hi! Can we use this Pilot-Credit in a LEED... |
|
Data Center systems in BaselineData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Mar 9, 2015, 3:08 pm
Greetings everybody I'm modeling a datacenter at the moment and there few issues I'm wondering how to proceed. Last reply: Rajesh Balachander, Jun 4, 2015, 2:00 am |
|
Entering nonregularily occupied spaces in IEQp1 spread sheet calNC-v4 EQp1: Minimum indoor air quality performanceposted by Vassil Vassilev on Jan 21, 2015, 8:39 am
Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores... Last reply: Vassil Vassilev, Apr 18, 2015, 3:53 am |
|
anticipated annual total ongoing consumables purchasesEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Agnieszka Rylska on Apr 1, 2015, 9:15 am
In the Reference Guide on page 254 in Table 1. it's written that "Purchases of of ongoing consumables during the performance period must represent at least 5% (by cost) of documented or... Last reply: Kimberly Schlaepfer, Apr 1, 2015, 1:19 pm |
|
Data Center Baseline systemsNC-v4 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Mar 10, 2015, 2:29 am
Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. Last reply: Marcus Sheffer, Mar 10, 2015, 10:03 am |
|
Eligibility for LEED- existing building structureLEED Rating System Selectionposted by Agnieszka Rylska on Mar 6, 2015, 4:58 amIt would be benificial to all if you could post the USGBC response on this forum. Good Luck! Log in or register to post comments Melissa Merryweather Director Green Consult-Asia LEEDuser Basic Member 245... Last reply: Melissa Merryweather, Mar 6, 2015, 9:09 pm |
|
Epoxy floor. Testing laboratoriesCS-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Irina Charkina on Nov 21, 2014, 10:03 am
Hello, Last reply: Irina Charkina, Feb 27, 2015, 4:11 am |
|
Are windows on one side, at large hall, sufficient?NC-2009 IEQc8.2: Daylight and views - viewsposted by Anna Korinkova on Feb 18, 2015, 11:26 am
“Hello, I am working on IEQc8.2 (views) for large logistic center. The hall dimensions are 230x60 metres. Question A) On the groundfloor, only the shorter side has windows which leads to the... Last reply: TODD REED, Feb 24, 2015, 11:22 am |
|
Petrol contaminationNC-2009 SSc3: Brownfield Redevelopmentposted by Alicja Bieszyńska on Jan 27, 2015, 3:06 pm
My project site is located next to one of the main arteries of Warsaw. Due to the high trafic the strip adjacent to the road is contaminated with petrol related substances (not much but still).... Last reply: Susan Walter, Jan 28, 2015, 4:33 pm |
|
Floor slab on gradeNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Jan 26, 2015, 9:10 am
Greetings, Last reply: Jean Marais, Jan 27, 2015, 3:22 am |