CSMP- CONSTRUCTION SCOPE

v4.1 IP:
posted by KHALID ALSHIBAN on Feb 8, 2023, 2:01 am

Hi everyone, 

I am working as Sustainability engineer in a Construction company. To be frank, I am still struglling between construction and design scopes and I was unable to idenftify the...

Regarding Energy Simulation

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by Nagaraj Sankar on Feb 8, 2023, 6:29 am

One of our data center projects has an electrical room. This electrical room didn't have regular occupants.  In this case, do we need to provide fresh air for that space? 

In Ashrae 62.1 (...

Detailed requirements for Option 1, Path (2)b-2: Life-Skills Training for Social equity within the PROJECT TEAM

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Amie Blankenship on Feb 8, 2023, 11:17 am

Regarding 'Social equity within the project team' (NOT WITHIN O+M STAFF) Option 1, Path (2)b-2: Participation in, or providing of, access to workforce development training through Life-Skills...

Natural ventilation compliance using energyplus Airflow Network

NC-v4 EQp1: Minimum indoor air quality performance
posted by Alessandro Zuanon on Feb 9, 2023, 8:42 am

Dear all,

i'm in the case of a warehouse in which natural ventilation is provided (CIBSE tool ok), but i have to demonstrate compliance with ASHRAE 62.1-2010 through simulation. I cannot...

Modeling District Energy via Option 1 path2 full DES

NC-v4 EAc2: Optimize Energy Performance
posted by elvin ruya on Feb 13, 2023, 3:36 pm

Hi, 

For a campus project, we would like to go with option 1 path2 full...

Model service infrastructure for energy simulation

NC-v4 EAp2: Minimum Energy Performance
posted by Linh Dang on Feb 15, 2023, 5:17 am

Dear all

We are doing an energy simulation for a factory project and it has a wastewater treatment building using AC and OA fans. Now we only model the manufacturing building. So do we...

Window to wall ratio-Existing Building

NC-v4 EAp2: Minimum Energy Performance
posted by Helena Garcia on Feb 20, 2023, 7:29 am

Dear LEEDusers,

A question related with the proposed and baseline building energy models for a BD+C project:

For an existing building where only single parts of the envelope will be...

Equations and calc methods

EBOM-v4.1 EQp4: Indoor Environmental Quality Performance
posted by Ricardo Filho on Feb 21, 2023, 5:03 am

I am doing some research on the LEED v4.1 O+M and I came across some questions regarding this credit. Anyone has any idea about possible answers?

Thanks ! :)

IEQ efficiency

a...

SIR and TE values of similar color painings

Pilot-Credits SSpc154: Heat Island Mitigation with Cool Walls
posted by Valeria Padilla on Feb 21, 2023, 4:20 pm

I am struggling finding the...

IPpc 101 Team journey throughout project submission

Pilot-Credits IPpc101: Integrative process
posted by Amal Ashraff on Feb 22, 2023, 9:34 pm

My team has successfully obtained this point in previous project submissions by demonstrating the effectiveness of communication channels among teammates. Throughout various discussion sessions,...