Forum quick links
Pilot Credit 42: Integrated Process
NC-2009 IDc1:Innovation in Designposted by AshLee Eustace on
My project had been planning on registering for Pilot Credit 42: Integrated Process, but it appears that this is pilot credit is no longer an option.
Changing compliance path after preliminary review
posted by Matthew Merli on
We just received our comments back for our first (preliminary) construction review.
Wall covering adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Bruce Maine on
Apologies if I've missed a post but is the VOC threshold for wall covering adhesives 50 g/L or 70 g/L? Or something else? Thanks.
Ceiling Clouds
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Eri Spaulding on
We have a music room with some hanging ceiling clouds that contain acoustical ceiling tiles with a high NRC (.90). Can we count the cloud areas twice?
Fuel efficient car vs single occupancy and 2-person carpool
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Andrea Marzullo on
One commuter drove a Civic hybrid each day to work (10 trips under fuel-efficient car).
Radon Potential Maps
posted by Trudy Y. Smith on
I agree with Jeff @ Tahoe that the EPA radon zone maps are so out of date and misleading that they should only be used as a last resort.
Occupied/Partially Occupied definition inquiry
NC-2009 PIf3:Occupant and Usage Dataposted by Alfred Rosales on
In the guidebook, the definition of Regularly occupied spaces are areas where workers are seated or standing as they work inside a building. I would like to inquire the following: 1.
Pre Development & Post Development runoff rate & quantity zero
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Heather Holdridge on
We are working on a Core & Shell project on Cayman Islands and would like to pursue SS Credit 6.1 & 6.2.
Name Change in the Project
posted by Michelle Deschaaf on
We have a project that we registered with one name and the client decided to change their company name when the project was complete. We are still in the process of filling out all the templates.
IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by susan eguia on
Hi, We've got the review comments from USGBC that says: "Please provide a separate ventilation rate procedure calculation for each multiple-zone recirculating system serving the LEED-NC project.