LEED Online v2.0CS-2009 IDc2: LEED Accredited Professionalposted by javier bolanos zeledon on Jul 29, 2010, 11:00 am
I'm sorry if this is to obvious question but I'm new at this. Last reply: javier bolanos zeledon, Aug 8, 2010, 9:08 pm |
|
Help with Interpretation!CI-2009 EAp3: Fundamental Refrigerant Managementposted by Dan LeBlanc on Mar 18, 2010, 12:13 pm
What is clear is that all equipment within the LEED-CI scope must be CFC-free. Whether this extends to the base-building systems is still unclear. Although the prerequisite seems to include only... Last reply: Shillpa Singh, Aug 6, 2010, 3:23 pm |
|
Lighting Power DensityCS-2009 SSc8: Light Pollution Reductionposted by Tom Fik on Aug 6, 2010, 3:22 pm
Is there maximum allowable... |
|
Building Area Method Compliance PathCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Andreas M. Roessler on Aug 6, 2010, 8:13 am
We've got a question concerning "Building Area Method Compliance Path" in the Chapter 9: "Lighting", ASHRAE Standard 90.1-2007. Appendix G: Performance Rating Method involves the Table G3.... Last reply: Dane Sanders, Aug 6, 2010, 2:02 pm |
|
Exterior WindowsCI-2009 IEQc8.1: Daylight and views - daylightposted by kelvin duen on Jul 29, 2010, 11:57 am
Our Project's exterior windows were installed prior to moving into the building. The make and model of the windows are thus unknow. What value do I use for the... Last reply: Jill Perry, PE, Aug 6, 2010, 1:10 pm |
|
EQ Credit 8.1 Prescriptive Method for Top LightingNC-2009 IEQc8.1: Daylight and views - daylightposted by Kendal Neitzke on Aug 6, 2010, 10:16 am
I am working through the prescriptive calculations for daylighting for a 64,312 sq ft open floor manufacturing facility where the exposed roof deck is 41'-6" above the finished floor. This one... Last reply: Eddy Santosa, Aug 6, 2010, 11:30 am |
|
Using different metrics (volume and weight) for MR: Solid WasteEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Andrew Barnes on Aug 6, 2010, 9:03 am
In LEED EB:O&M, MR credits 7-9, measurment and documentation of on-going consumable, durable goods, etc. is required during the performance period. My understanding is that this is to be... Last reply: Dan Ackerstein, Aug 6, 2010, 11:12 am |
|
kitchen facilities and LEED rating system selectionGeneral forumsposted by Tristan Roberts on Aug 5, 2010, 8:43 pm
Interesting question. If this were only about selecting a LEED rating system, I would say that it falls under LEED for New Construction, not LEED for Homes, due to the lack of kitchen facilities... Last reply: Larry Jones, Aug 6, 2010, 9:12 am |
|
Existing AHU serves more than the LEED tenant space- what to do?CI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Philip Herriges on Aug 5, 2010, 11:23 am
The LEED CI Addenda dated July 19, 2010 modifies the third bullet point under EQc5 as follows: Replace the text of the third bullet on page 359 with the following: Last reply: Philip Herriges, Aug 6, 2010, 7:45 am |
|
LEED-CI credits on a LEED-EBOM projectGeneral forumsposted by Tristan Roberts on Aug 6, 2010, 12:32 am
I'm actually not sure you're on the right track. |