Integrative Analysis of Building Materials

CS-v4 INc1: Innovation
posted by Chris Lombardo on Apr 14, 2021, 6:45 pm

The project team was able to complete this pilot credit by reviewing information gathered during the material submittal process and analyze supporting product documentation. In filling out each...

Credit Scope- VOCs in material ingredients

NC-v4 EQc2: Low-emitting materials
posted by Instra Ingenieros on Apr 15, 2021, 3:12 am

Hello all,

We are working on a project in Europe and trying to achieve the EQ Low-emitting material credit.

Regarding some materials we have some doubts about the limits to consider...

VOC Emission Limit California Department of Public Health (CDPH) Standard Method v1.1–2010

NC-v4 EQc2: Low-emitting materials
posted by V Leung on Apr 15, 2021, 5:21 am

According to the Manual, the statement is as below.

Manufacturers’ claims of compliance with the above requirements must also state the range of total VOCs after 14 days (336 hours),...

LEED Interpretation 10471

CI-v4 IPc1: Integrative process
posted by Dave Hubka on Apr 15, 2021, 2:04 pm

I just learned from a LEED review report that owner's renovating their own space must "identify one or more viable locations, undertake the comparison outlined in Site Selection requirements, and...

Off Gassing

LEED Canada Forum
posted by Darryl Chrenek on Apr 20, 2021, 10:00 am

If we had to use a subfloor adhesive that was 160gl and not our normal 100gl that is followed by 3 layers of materials(plywood, underlayment and marmollium flooring) how long would it need to off...

Experience Feedback for Biophilia

Pilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environment
posted by Maddie Spinski on Apr 20, 2021, 12:53 pm

In our early childhood education center, the large outdoor play space is supplemented with a separate support building that provides additional opportunity for children to experience the...

v4.1 MRc5 option 2 with MRpc87

NC-v4.1 MRc5: Construction and demolition waste management
posted by Kyle Roth on Apr 21, 2021, 11:41 am

Can you use the pilot credit Verified Construction & Demolition Recycling Rates with the v4.1 Construction and Demolition Waste Management credit, option 2?

Condenser heat recovery pump

Healthcare-v2009 EAc1: Optimize Energy Performance
posted by Davide Liviero on Apr 23, 2021, 3:12 am

Hello everyone,

I am modeling a hospital which is served by district coooling, which I am modeling using Option 2 of the guidance (...

Underground infiltaration system as LID practice?

NC-v4.1 SSc4: Rainwater management
posted by Barbara Beckmann on Apr 27, 2021, 2:42 am

For our project a underground...

Non emitting product

NC-v4 EQc2: Low-emitting materials
posted by Almudena Roman on Apr 28, 2021, 7:19 am

Good morning,

We manufacture mortars for construction in Europe... one of our mortars does not content any kind of ingredient cosidered organic... in that case, could it be considered as a...