Forum quick links
IEQc8.1 Day Lighting exempt spaces
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Brady Hartmann on
I am trying to determine if a specific room can be excluded from the day lighting calculation.
Outdoor Air Contamination
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Norma Lehman on
We have a project that has failed an IAQ test by exceeding TVOC levels.
NC 2009 - Green Cleaning ID credit
NC-2009 IDc1:Innovation in Designposted by Joseph Ford, AIA on
Maybe I haven't looked in the right place but I have read many comments and haven't found clarity on what a proven strategy is for earning a green cleaning ID credit in NC 2009.
infiltration
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
If I model a building where there is mechanical ventilation, how shall I consider the infiltration (i.e.
WE p1 for Commercial Interiors Retail - Process Water Use
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by María Fernanda Aguirre on
Hi every one: I am working in a project in Chile, it is a Foodmarket located within a Mall which is also pursuing LEED Certification.
Paint Certified by Eco Label Organization
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Jackson . on
Does Paint or sealant certified by eco label (based on ISO 14024) can contribute weight into this credit?
EAP2 and EA1 appeal
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
my EAP2 was awarded but EA1 was denied. I would like to appeal for 10 points of EA1. What should I do?
Submit EAp2 & EAc1 Design Phase, Add Renewable Energy Later
NC-2009 EAc1:Optimize Energy Performanceposted by Ralph Bicknese on
Our LEED-Schools 2009 project is close to Preliminary Design Submittal. One issue which is still under consideration is the renewable energy system.
CS EA Credit 1: Area Used for Baseline HVAC System Types
CS-2009 EAc1:Optimize Energy Performanceposted by Julia Haiduk on
Core & Shell Appendix 2 requires that the baseline core and shell HVAC system be modeled per ASHRAE 90.1-2007 Table G3.1.1A.
Painting Onsite
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Abdulrahman Sherazy on
Due to the overload of work in the factory of doors we contracted with for our project, the doors will not be ready and supplied on time.