Does anyone have experience with construction waste generated outside of a project's LEED boundary? We have project that is owned by the city, who is also the waste hauler. The city is also developing the parcel to the south, but that parcel is not within our LEED boundary. There isn't enough area on the non-LEED site for separate waste and recycle dumpsters. They would like to use the LEED-project's recycle dumpsters (and, possibly trash dumpsters also) rather than send a considerable amount of metal to the landfill. Is there a way to do this and not include that portion from our calculations?