NC 2009 ID point for LEED EBOM 2009 MRc4 Reduced Mercury
NC-2009 IDc1:Innovation in Designposted by Lindsey Evans on
I am wondering if anyone has had success submitting an ID credit in LEED NC 2009 for complying with the requirements of LEED EBOM 2009 MRc4 Reduced Mercury.
Supplementary Cementitious Materials
NC-2009 MRc4:Recycled Contentposted by Marcio Alberto Casado Pereira on
RefGuide says in page 373 "In the case of supplementary cementitious materials (SCMs) used in concrete recycled from other operations, the recycled content value can be based on the mass of the cem
WWR calculation - green wall - lattice
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Hi all! I’m modeling a 49-story building with 7 basements, and it has over 40 % (about 85 %) of its envelope covered with glazing, so I have a doubt about the calculation on the Window to Wall Ra
Changing and Shower facility
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Hanne Goa on
According to Leed NC we require for 911 FTEs x 0,5% = 4,6 Changing and Shower facilities (=5).
Substantive revisions
posted by Bill Swanson on
Are LEED rules being followed? These changes since v2009 was issued sure don't feel like errors and corrections. It just feels like LEED is now treated as a living document.
what can be included in LEED project boundary?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Adam Targowski on
The owner has a land which is divided into 3 parts.
LEED Project Boundary/Parking
NC-2009 PIf1:Minimum Program Requirementsposted by renee jimenez on
We are designing a Triple A ballpark on a parcel of land owned by the City approx.
Doubt about the Budget System type
CI-2009 EAp2:Minimum Energy Performanceposted by Rodrigo Dias on
Hello I'm simulating a store to the LEED CI cetification and using the section 11 to create the Budget Building Design.
Existing Office Building - LEED CI or EBOM?
posted by Martin Camargo on
We have a project consisting of approximately 8000 square feet of office space that was fully built-out about a year ago.
landscaping changes after Design Preliminary Review
posted by Ryan Carron on
We've had some changes to our site plan since the Preliminary Review and are currently submitting for the Design Final Application.