Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

NC 2009 ID point for LEED EBOM 2009 MRc4 Reduced Mercury

NC-2009 IDc1:Innovation in Design
posted by  Lindsey Evans  on 

I am wondering if anyone has had success submitting an ID credit in LEED NC 2009 for complying with the requirements of LEED EBOM 2009 MRc4 Reduced Mercury.

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Jan 8, 2013, 9:22 pm

Supplementary Cementitious Materials

NC-2009 MRc4:Recycled Content
posted by  Marcio Alberto Casado Pereira  on 

RefGuide says in page 373 "In the case of supplementary cementitious materials (SCMs) used in concrete recycled from other operations, the recycled content value can be based on the mass of the cem

7
Tue Jan 8, 2013, 9:04 pm

WWR calculation - green wall - lattice

CS-2009 EAp2:Minimum Energy Performance
posted by  Ron Dean  on 

Hi all! I’m modeling a 49-story building with 7 basements, and it has over 40 % (about 85 %) of its envelope covered with glazing, so I have a doubt about the calculation on the Window to Wall Ra

5
Tue Jan 8, 2013, 8:42 pm

Changing and Shower facility

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Hanne Goa  on 

According to Leed NC we require for 911 FTEs x 0,5% = 4,6 Changing and Shower facilities (=5).

3
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Tue Jan 8, 2013, 4:57 pm

Substantive revisions

General forums
posted by  Bill Swanson  on 

Are LEED rules being followed? These changes since v2009 was issued sure don't feel like errors and corrections. It just feels like LEED is now treated as a living document.

13
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Tue Jan 8, 2013, 4:20 pm

what can be included in LEED project boundary?

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Adam Targowski  on 

The owner has a land which is divided into 3 parts.

5
Tue Jan 8, 2013, 1:04 pm

LEED Project Boundary/Parking

NC-2009 PIf1:Minimum Program Requirements
posted by  renee jimenez  on 

We are designing a Triple A ballpark on a parcel of land owned by the City approx.

3
Default Avatar
principal
mnk architects
LEEDuser Basic Member
8 thumbs up
Tue Jan 8, 2013, 12:59 pm

Doubt about the Budget System type

CI-2009 EAp2:Minimum Energy Performance
posted by  Rodrigo Dias  on 

Hello I'm simulating a store to the LEED CI cetification and using the section 11 to create the Budget Building Design.

3
Mon Jan 7, 2013, 7:16 pm

Existing Office Building - LEED CI or EBOM?

LEED Rating System Selection
posted by  Martin Camargo  on 

We have a project consisting of approximately 8000 square feet of office space that was fully built-out about a year ago.

4
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Mon Jan 7, 2013, 3:52 pm

landscaping changes after Design Preliminary Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ryan Carron  on 

We've had some changes to our site plan since the Preliminary Review and are currently submitting for the Design Final Application.

6
Default Avatar
Owner / Energy Engineer / Sustainability Consultant
Sustainnovations, LLC
LEEDuser Basic Member
94 thumbs up
Mon Jan 7, 2013, 9:31 am