Topic | Recent |
---|---|
Strategy to retain runoffNC-v4 SSc4: Rainwater managementposted by Ricardo Sá on Jun 9, 2020, 6:52 am
Dear All, This credit requires that project retains on site (i.e. infiltrate, evapotranspirate, or collect and... |
|
Public Transportation subsidy?NC-v4 LTc5: Access to quality transitposted by Erin Holdenried on Jun 9, 2020, 11:54 am
Reduced Parking and Green Vehicles offer credit for 20% discount in place of preferred parking. Has anybody tried a similar ACP approach for this credit? To get some credit, such as 1 point, if... |
|
Where can I find the coefficients of evapotranspiration for projects in Morocco?NC-v4 WEp1: Outdoor water use reductionposted by Sara BENLOUBA on Jun 11, 2020, 11:13 am
Hello Dears, For the purposes of calculating the pourcentage (%) of the saving of outdoor water compared to baseline, I need the coefficients of evaportranspiration. We could find a ... |
|
Sisal 100% Natural Fiber CarpetNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Andrea Tirao on Jun 15, 2020, 8:48 am
Our project is a museum which targets IEQc4.3. One of the specified carpet for the project is 100% Sisal and we cannot find a manufacturer of Sisal with Green Label or Greenguard certification.... |
|
WELL 36:Water treatment w/Ultraviolet germicidal irradiation as a LEED v 4 ID creditWELL v1 Building Standard Tip Sheetposted by Elda Silva on Jun 15, 2020, 6:22 pm
Hello, I am wondering if Ultraviolet germicidal irradiation at the water Inlet valve of the project could be used as an ID credit for LEED v4. The project is located in northern Peru,... |
|
Confidential ProjectPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Junko Miyamoto on Jun 15, 2020, 9:08 pm
Hello. My project is going to pursue the Open pilot credit EQpc123 - Designing with Nature, Biophilic Design for the Indoor Environment. I wonder if the project registered to the Pilot... |
|
feed back the surveyPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Junko Miyamoto on Jun 15, 2020, 9:16 pm
Hellow. I need to complete the feedback survey for achieving the pilot credit point. Is the project information that input in the survey will be published ? My project is... |
|
Total duration for a LEED v4.1 EBOM processLEED v4.1 Discussion Forumposted by Eric Bautista on Jun 15, 2020, 10:27 pm
This is for the purpose of providing our LEED proposal to a client. Anybody could help with citing the total recommended duration (in months) for a LEED v4.1... |
|
Mixed use buildings minimum storage spacesNC-v4 LTc6: Bicycle facilitiesposted by Yara Salama on Jun 15, 2020, 11:31 pm
Hello, For a mixed use building (commercial and residential), what is the minimum number of short term storage spaces? Is it 4 spaces for each portion so it totals for 8 spaces for the... |
|
Landscaping lightingLEED v4.1 Discussion Forumposted by Davide Liviero on Jun 18, 2020, 8:59 am
Hello everyone, I am modeling an office building and i am encountering problems with the exterior lighting. I have two lights for the green area just outside of the office. I suppose I... |