counting "individual" spaces
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Erica Downs on
Would a private 2-person office count as one space or 2 when calculating the 50%?
Filtration during construction ( MERV 8)
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Sharon Morris on
I am currently working on a project that has a dual HVAC system. A Daikin mini split ductless system and a DOAS Desert Eir system with ducts & filtration.
Large Process Loads from Data Center in Office building
NC-2009 EAp2:Minimum Energy Performanceposted by Therese Malm on
We are working with a building where 60% of the annual energy use accounts for process energy due to a large data center.
process load
NC-2009 EAp2:Minimum Energy Performanceposted by HOUCINE TLEMSANI on
We are having the same problem working on a building where 48% of the annual energy usage is process load from computers, screens and tv’s.
Concrete Sealer
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Allen Cornett on
Under Option 1 Table IEQc4.3-1 in the online form list "FloorScore" as the reference standard for "Sealer: Waterproofing, Concrete/Masonry", while it list "SCAQMD Rule 113" as the reference standar
Mineral-based finished flooring products
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Allen Cornett on
In an addenda issued on 4/14/10 the followimg is stated, “Mineral-based finish flooring products such as tile, masonry, terrazzo, and cut stone without integral organic-based coatings and sealants
Mock up Room Waste Management
NC-2009 MRc2:Construction Waste Managementposted by John Covello on
Hi All, Our site is starting off with a mock up guest room villa as a test bed before we construct the balance of 90 odd guest villas.
MPR for adjacent buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
LEED project boundary lines that “slice” through party walls must not pass through any MEP service infrastructure.
EAP2 Mandatory Requirement
NC-2009 EAc1:Optimize Energy Performanceposted by OSCAR DE LA RED on
Can an almost construted building be certified under LEED C&S, if the envelope building is not able to comply with EAP2,EAc1 ASHRAE 90.1.2007 mandatory requirement (OPTION 2 and 3 are not av