Help with Interpretation!

CI-2009 EAp3: Fundamental Refrigerant Management
posted by Dan LeBlanc on Mar 18, 2010, 12:13 pm

What is clear is that all equipment within the LEED-CI scope must be CFC-free. Whether this extends to the base-building systems is still unclear. Although the prerequisite seems to include only...

Last reply: Shillpa Singh, Aug 6, 2010, 3:23 pm

Lighting Power Density

CS-2009 SSc8: Light Pollution Reduction
posted by Tom Fik on Aug 6, 2010, 3:22 pm

Is there maximum allowable...

Building Area Method Compliance Path

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by Andreas M. Roessler on Aug 6, 2010, 8:13 am

We've got a question concerning "Building Area Method Compliance Path" in the Chapter 9: "Lighting", ASHRAE Standard 90.1-2007.

Appendix G: Performance Rating Method involves the Table G3....

Last reply: Dane Sanders, Aug 6, 2010, 2:02 pm

Exterior Windows

CI-2009 IEQc8.1: Daylight and views - daylight
posted by kelvin duen on Jul 29, 2010, 11:57 am

Our Project's exterior windows were installed prior to moving into the building. The make and model of the windows are thus unknow. What value do I use for the...

Last reply: Jill Dalglish, PE, Aug 6, 2010, 1:10 pm

EQ Credit 8.1 Prescriptive Method for Top Lighting

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Kendal Neitzke on Aug 6, 2010, 10:16 am

I am working through the prescriptive calculations for daylighting for a 64,312 sq ft open floor manufacturing facility where the exposed roof deck is 41'-6" above the finished floor. This one...

Last reply: Eddy Santosa, Aug 6, 2010, 11:30 am

Using different metrics (volume and weight) for MR: Solid Waste

EBOM-2009 MRc7: Solid waste management - ongoing consumables
posted by Andrew Barnes on Aug 6, 2010, 9:03 am

In LEED EB:O&M, MR credits 7-9, measurment and documentation of on-going consumable, durable goods, etc. is required during the performance period. My understanding is that this is to be...

Last reply: Dan Ackerstein, Aug 6, 2010, 11:12 am

kitchen facilities and LEED rating system selection

General forums
posted by Tristan Roberts on Aug 5, 2010, 8:43 pm

Interesting question. If this were only about selecting a LEED rating system, I would say that it falls under LEED for New Construction, not LEED for Homes, due to the lack of kitchen facilities...

Last reply: Larry Jones, Aug 6, 2010, 9:12 am

Existing AHU serves more than the LEED tenant space- what to do?

CI-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Philip Herriges on Aug 5, 2010, 11:23 am

The LEED CI Addenda dated July 19, 2010 modifies the third bullet point under EQc5 as follows:

Replace the text of the third bullet on page 359 with the following:
“In mechanically...

Last reply: Philip Herriges, Aug 6, 2010, 7:45 am

LEED-CI credits on a LEED-EBOM project

General forums
posted by Tristan Roberts on Aug 6, 2010, 12:32 am

I'm actually not sure you're on the right track.
The project requirements aside, I would want to make sure you're using the right rating system, by checking the...

IEQc5: High-Volume Copy/Print/Fax Areas

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Sara LeMone on Aug 5, 2010, 5:03 pm

Hypothetically, suppose you will have 800 employees who print/fax/copy anywhere between 100-125 pages each, every month. You also have 3 copy rooms... That's a total of 80,000-100,000 copies/...

Last reply: Tristan Roberts, Aug 6, 2010, 12:24 am