Eligibility based on absense of system
posted by Timothy Nabholz on
Hey all, I was wondering if there was any notion on whether there were thoughts to award points to those who do not have a negative aspect on their project. Ie.
Regarding Level of Sub metering
CI-2009 EAc3:Measurement and Verificationposted by Maria Porter on
Hi Have I understood it correctly, that for a tenant less than 75 %, it is enough to sub meter the electricity for that tenant (plug loads and lighting) in one meter?
Calculation of drawdown rate Qr
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Christian Brücher on
I have a question for a Czech colleague of mine. The have a project and want to install a stormwater storage tank. The water shall be used for toilet flushing in the building.
SRI value unknown!
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Mike Stopka on
I'm using a grey asphalt shingle as my roofing material and the manufacturer has no SRI or emittance information. What can I do to achieve this credit?
Community Connectivity: Minimum area for 10 units per acre
NC-2009 SSc2:Development Density and Community Connectivityposted by Bob Cummings on
The Reference Guide says "a residential area with a minimum density of 10 units per acre must be present within the (1/2 mi.) radius (502.4 acres)." Is there a minimum percentage of the area withi
Option 2 - The Performance Rating Method
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Emma Eliasson on
Hi, LEED Reference Guide For Green Interior Design And Construction says in chapter EAc1.3 (# 6.
Liquid Lava
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Allen Cornett on
I have a client wanting to install modular panels consisting of liquid sealed within the tiles in a small area of their building.
particle board
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Jaida Anderson-Lozano on
Would particle board be considered for this credit requirements? We have a situation where we are using it on the floor but I wouldn't necessarily see this as being held to these requirements.
EA P2 and EA C1 requirements clarifications
NC-2009 EAc1:Optimize Energy Performanceposted by BABAR MEHMOOD on
in EA P2, it's written to comply with mandatory provisions which are for example 5.4 which is related to Building envelope under Option 1.