Topic | Recent |
---|---|
green builders in New EnglandLEED v4.1 Discussion Forumposted by DiegoMaxwell DiegoMaxwell on Jan 16, 2020, 2:41 am
Hey, I just found this sub, so apologies if this post isn't appropriate. I've been working as a carpenter for a few years and am getting interested in building science. I'd like to work... |
|
Composite Wood Evaluation- Required DocumentationNC-v4 EQc2: Low-emitting materialsposted by Allan Robles on Jan 17, 2020, 5:27 pm
Hi LEED User-verse again! I need assistance affirming my understanding (and also summarizing) the documentation requirements for meeting the composite... |
|
Hotel SurveyNC-2009 IEQc7.2: Thermal comfort - verificationposted by Jorge Adalberto Bernal Segovia on Jan 18, 2020, 9:40 am
Good afternoon, Thank you |
|
Waste Management- CommingledLEED v4.1 Discussion Forumposted by Alexis Stewart on Jan 21, 2020, 10:22 am
I read the below for LEED V4: How the language currently reads, if you recycle 10 different materials all in 1 commingled dumpster, that only counts as 1 waste stream. This makes material... |
|
Lead Based Paint WasteLEED v4.1 Discussion Forumposted by Alexis Stewart on Jan 21, 2020, 10:59 am
In the beginning of the project we had a large portion of Lead based paint that was disposed of. How does this count? Is there a way to not include this in our waste counts? |
|
Requirement of separate lighting control for small multi occupant spaces?CI-v4.1 EQc6: Interior lightingposted by Aishwarya Katta on Jan 21, 2020, 5:25 pm
We have a couple of small conference rooms which fall under the category of multi-occupant spaces. The credit says that "Lighting for any presentation or projection wall must be separately... |
|
Calculation of FTE in WE calculator for project with different occupancy schedule for each floor.NC-v4 WEp2: Indoor water use reductionposted by Sushrut Jadhav on Jan 22, 2020, 2:07 am
The project I am working on has total FTE -103 (90 Office employees + 13 Maintenance, Cleaning, and Security). Not all the floors of the building have the same occupancy times... |
|
In multi-family residential units, can a VTAC unit provide mechanical ventilation to meet 62.1-2010?NC-v4 EQp1: Minimum indoor air quality performanceposted by Sherman Aronson on Jan 22, 2020, 5:53 pm
In multi-family residential units, can a VTAC unit provide mechanical ventilation to meet 62.1-2010? The operable windows provide natural ventilation, but ASHRAE now requires mechanical... |
|
Shared LandscapeCS-v4 WEp3: Building-level water meteringposted by Ricardo Sá on Jan 23, 2020, 4:45 am
Dear All, One of our clients is developing a project that includes two buildings (9 levels office tower and a retail building) sharing a common landscape area. The... |
|
Shared Firefighting TankCS-v4 WEp3: Building-level water meteringposted by Ricardo Sá on Jan 23, 2020, 6:59 am
Dear All, One of our clients is developing a project that includes two independent buildings (9 levels office tower and a retail building) located in the same site but without any... |