Forum quick links
What means with "regularly used exterior entrances"?
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Sandra Holmström on
Does regularly used exterior entrances means that you can ignore all other entrances except the main entrance to the building? If not, what kind of entrances should meet the credit?
Wash Fountains not meeting .5 gpm baseline.
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Greg Kight on
Unless USGBC has a different interpretation with regards to wash fountains , we may not be able to get points on water conservation because the wash fountains (Bldg 3) uses 3 gpm.
Owner Purchased Contractor Installed
NC-2009 MRc5:Regional Materialsposted by Jessica Kilby on
I have not come across this situation before, but the Carpet for our entire building has already been purchased by the Owner.
I have restrooms in the
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
I have restrooms in the building I am certifying, an also restrooms with showers in a 40sqm building inside my project boundary.
what type of LEED product corresponds this paint
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Aldo Pazo on
Could someone help me to guess what LEED product type corresponds a "Paint composed of aliphatic polyurethane resins solvent, mineral fillers and pigments"? Thanks a lot!!
Tenant lighting
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Jean-Baptiste Noel on
Hi all, In our project, there will be a tenant lease agreement so that the Lighting Power density with which they design the office spaces should be below 9 W/m2 (lower than the base requirement u
Doubts about a Magnetic Chiller COP Value
NC-2009 EAp2:Minimum Energy Performanceposted by María Fernanda Aguirre on
Hi: We are working in a project in Lima Perú and the HVAC Engineer has just sent to us a submittal sheet of a Magnetic Chiller with a COP of 10,8.
Case 2 Calculator Update?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Jenny Stadelmann on
I noticed that the Case 2 Calculator has not been updated since the November Portfolio Manager update.
10 Year Lease Start Date
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Sean Falvey on
I am working on a project and the owner has a lease of 10 years, although it started in 2005 and will end in 2015.
What to do if no EAc1.3?
CI-2009 EAc4:Green Powerposted by Jennifer Berthelot-Jelovic on
I am trying to document this credit and we have not occupied the building for more than 3 months. So we are not able to document via the "Actual Consumption" route.