Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

BLOW OUT FIXTURE

CS-2009 WEp1:Water Use Reduction
posted by  OSCAR DE LA RED  on 

Do I have to use the 3.5 gpf for baseline and installed blow out fixture if installed fixture is lower than 1.6 gpf.

2
Thu Apr 25, 2013, 7:57 am

Showering and Changing Facilities in Men´s Bathroom

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Silvia Ruiz  on 

Hi, I am working on a small project that only requires one shower, but due to space constraints, the shower and changing room have been located inside the men's bathroom facilities.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Apr 25, 2013, 4:15 am

Title-24 and DES

General forums
posted by  Lauren Sparandara  on 

Hello, I have taken a look at Appendix B which includes Title-24 guidance within the District Thermal Energy LEED Guidance document.

8
Default Avatar
mechanical engineer
state of californiat
LEEDuser Basic Member
0 thumbs up
Thu Apr 25, 2013, 1:28 am

Tandem Spaces

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Michael E. Edmonds-Bauer  on 

Our project, due to physical limitations of the site being this quite small, is providing mostly all of the spaces in tandem across 8 underground levels. According to calculations we need to provi

4
Wed Apr 24, 2013, 6:09 pm

International Project without Cut Sheets

NC-2009 MRc4:Recycled Content
posted by  Josh Sawyer  on 

We are working on an international project and the contractor is telling us that the standards in their country lack cut-sheets and MSDS sheets.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Apr 24, 2013, 5:01 pm

new LEED Interpretation

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Tristan Roberts  on 

A new LEED Interpretation was released on 4/1/13 that is relevant to this credit.

3
Default Avatar
Woolpert
LEEDuser Basic Member
5 thumbs up
Wed Apr 24, 2013, 12:56 pm

waste stream audit

Waste Stream Audit Protocol
posted by  Fatma Al-Fahad  on 
1)During the solid waste audit process, is it accepted to include all kinds of paper under one description( mixed paper)?
3
Default Avatar
Principal Project Manager
Jones Lang LaSalle GmbH
LEEDuser Basic Member
2 thumbs up
Tue Apr 23, 2013, 8:56 pm

Upload Documentation

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Albert Sagrera  on 

How can we upload documentation justifying this credit? Calculations on 90% average annual rainfall, 80% TSS removal, and other documentation?

3
Default Avatar
Architect
Societat Organica
LEEDuser Basic Member
11 thumbs up
Tue Apr 23, 2013, 3:13 pm

Comfort Survey

Performance Period
posted by  Jennifer Knocha  on 

We have been asked if it is possible to conduct an additional comfort survey and submit the results, even though we have already completed the initial submission and gotten our first set of review

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 23, 2013, 2:03 pm

Question

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Redy Truccolo  on 

Hi Everybody, I'm doing a CS 2009 Pre Certification and I've already achieved the 50% reduction for the WEc2 Innovative Wastewater technologies. My question is, if I apply for this Pilot Credit (w

4
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Tue Apr 23, 2013, 10:08 am