Topic | Recent |
---|---|
Any advantage over v4?Schools-NC-v4.1 SSc5: Heat Island Reductionposted by Chelsea Miller on May 3, 2019, 3:43 pm
Is there any advantage to replacing this specific LEED v4 credit with LEED v4.1? I thought I had read somewhere that Non-roof and Roof measures could be separated, so that one might obtain at... |
|
Process Crop in Open Space CalculationsNC-v4 SSc3: Open spaceposted by Candice Rogers on May 6, 2019, 10:38 am
Good morning - I have a 6 acre site of which 1 acre is a hemp crop. The crop is intended to be educational and research centered. It will have walking paths to it. That said, it does... |
|
LCA BaselineNC-v4 MRc1: Building life-cycle impact reductionposted by Elizabeth Repin on May 6, 2019, 12:48 pm
Hello: Can we only change envelope assemblies for baseline; do all other items to be the same as the proposed building? Thank You! |
|
Exemplar performance as per the previous V4CS-v4.1 LTc7: Reduced parking footprintposted by Ciaran McCabe on May 7, 2019, 11:43 am
Hi, If I am pursuing Reduced Parking Footprint under LEED v4.1 is possible to achieve exemplar performance as per the previous V4 ? Thanks. |
|
LCA in accordance with ISO 14071CS-v4.1 MRc2: Environmental Product Declarationsposted by Jennifer Pitkanen on May 8, 2019, 8:09 am
Hi, In MRc2 Option 1, the second bullet under "Life-cycle assessment and environmental product declarations" says: Product-specific Type III EPD -- Internally Reviewed. Products... |
|
Heat Island Effect PotentialNC-v4 SSc1: Site assessmentposted by Samantha Varela on May 8, 2019, 11:50 am
Is there an accurate urban heat island map to utilize for this section of the Site Assessment? I have only found very vague (a whole country) or very specific site if the local... |
|
Option 2: Inputting Direct and Diffuse Horizontal Irradiance in IESNC-v4 EQc7: Daylightposted by on May 9, 2019, 12:38 pm
I'm working in IES to evaluate the daylight LEED credit option 2 for a project, and one of the requirements is to input direct and diffuse horizontal irradiance. Does anyone know how this can be... |
|
Other Buildings within LEED BoundaryNC-v4 SSc5: Heat Island Reductionposted by Max Krueger on May 9, 2019, 3:40 pm
Should other buildings within the LEED boundary be counted towards this credit? These existing buildings will not be getting certified. |
|
CIBSE Narrow Plan RequirementNC-v4 EQp1: Minimum indoor air quality performanceposted by gjn on May 9, 2019, 11:25 pm
Hello everyone, Are there any alternatives for complying CIBSE AM10 requirement for narrow plan? Our project will have a building width that is greater than 15m by almost 4m even with the... |
|
Bike numbers for ResortNC-v4 LTc6: Bicycle facilitiesposted by Neshat Sakeena on May 12, 2019, 1:39 am
I am working on a resort project located at a remote location. The resort has a bicycle track that connects to single room chalets that will have an... |