Topic | Recent |
---|---|
Renewable Energy Calculation (Energy vs Costs)NC-v4 EAc5: Renewable energy productionposted by Michael Tsang on Oct 13, 2020, 3:04 am
Hi Everyone, I have some questions regarding the calculations for... Last reply: Marcus Sheffer, Oct 13, 2020, 1:50 pm |
|
Gravel, Ice-PlantsNC-v4 SSc3: Open spaceposted by Michael Tsang on Feb 12, 2020, 4:48 am
Hello LEEDuser Community! I have two questions related to calculating the 25% Vegetated Space for the Sustainable Sites Credit in LEED v4.0: (1) If we are landscaping using a... Last reply: emily reese moody, Feb 12, 2020, 8:26 pm |
|
Bike numbers for ResortNC-v4 LTc6: Bicycle facilitiesposted by Neshat Sakeena on May 12, 2019, 1:39 am
I am working on a resort project located at a remote location. The resort has a bicycle track that connects to single room chalets that will have an... |
|
Expiration date on Green Label PlusCS-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Lise Dannesboe on Oct 12, 2017, 11:32 am
Hi. Is there a requirement to the expiration date of the certification? We just recevied a carpet with a Green Label plus certificate, which has an expiration date on the 31of decmeber 2017. Can... Last reply: Kristina Bach, Oct 12, 2017, 12:17 pm |
|
Chilled water flow and pipe sizesCI-2009 EAc1.3: Optimize energy performance - HVACposted by Jayakumar Pamuri on Oct 25, 2016, 1:34 am
Hi All, I am here to post my query about chilled water system,flow and pipe sizes. As everybody know chilled water flow is 1.5 usgpm/tr when chiller is selected at delt T 16°F & 2.4... Last reply: Bazeeth Ahamed K M, Oct 26, 2016, 3:10 am |