Forum quick links
Can a credit in one rating system be considered ID in another?
NC-2009 IDc1:Innovation in Designposted by Stantec BG+LU FW on
Can a credit that occurs in one rating system be considered an ID credit in another rating system if there is no equivalent credit? The example: I am using LEED – NC.
LEED EB&OM Hospital
posted by Brendan Molony on
When LEED EB certifying a hospital with multiple buildings that are all interconnected with tunnels, energy, water, one address, and waste, operating as one building.
Great Post!
posted by Dylan Connelly on
Great post Tristan - very informative. How soon will the new LEEDv4 be a part of LEEDUser? I'd love to see the raw LEED documentation documents before telling an owner we should go for it.
Submeter for process uses
CI-2009 EAc3:Measurement and Verificationposted by Shoko Yasuda on
Hello, I am doing CI Retail project (LEED-CI 2009 EAc3 Case 1) and it includes dish washer and ice cube machine. I understand that we have to have sub meters for process loads.
Compliance Path Questions
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Catherine Blakemore on
For each Group, do all products listed have to follow either Path 1 or Path 2? For eample Group 3 offers: Path 1.
High bay Areas LPD
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
We are working on a project with a bus repair bay areas for which we considered as "High Bay" areas for the energy model due to the fact that these areas are higher than 25 ft.
more than 1 system to simulate baseline building?
NC-2009 EAc1:Optimize Energy Performanceposted by jaume balana on
Hello, Our project is a two floors and 1300 m2 building, opened to four orientations.
Embolden ACC?
posted by SmithGroup BG+LU FW on
Nadav, With all due respect, nothing we do or don't do with regard to v4 will make a difference to the ACC and its allies.
Re: Tips for Passing the LEED Green Associate Exam
posted by Claire Moloney on
Thanks for a great post, Paula! I took the exam in December 2010 as a Cornell student, and I didn't use the BD+C reference guide.
Unmet Load Hours
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
HVAC plans show the room setpoint. This should be the OPERATIVE temperature.