Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

recirculation

NC-2009 EAc1:Optimize Energy Performance
posted by  jaume balana  on 

Is it mandatory to have recirculation (for a system 4)?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jul 8, 2013, 3:00 pm

Project Registration and Design Submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Gaston Viau  on 

It will be my first time registering a project so I have some doubts I would like to share with you. Our project is a NC commercial building.

3
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Jul 8, 2013, 1:37 pm

Adhesive category for Foster 85-20

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  cathy keagle  on 

What is the appropriate category for Foster 85-20? Our contractor told us that it was Special Purpose Contact Adhesive. And how do we verify this?

3
Mon Jul 8, 2013, 1:10 pm

Defining the baseline

NC-2009 EAc5:Measurement and Verification
posted by  Gustav Alfaro  on 

Hi to all: Please help me to clarify how the baseline model is defined for the M&V plan, it is clear that for the "actual case" the proposed model created for the EAc1 must be calibrated based

5
Default Avatar
Mechanical Engineer
LEEDuser Basic Member
10 thumbs up
Fri Jul 5, 2013, 4:56 pm

With Specialty expired

General forums
posted by  Bill Swanson  on 

I know several people who opted in but never completed the 30 hours of continuing education in the required 2 year period and now have expired specialties.

16
Default Avatar
Mechanical Engineer
AECOM
LEEDuser Basic Member
0 thumbs up
Fri Jul 5, 2013, 3:41 am

LEED Interpretation #10134 as applied to fan coils

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Silvia Ruiz  on 

Hi, Would a project be eligible to apply for this credit if the scope of work includes the provision and installation of 100% of the fan coils serving the certifiable space, even if they don't ha

5
Default Avatar
Civil Engineer & Sustainability Coordinator
Studio Domus
LEEDuser Basic Member
7 thumbs up
Thu Jul 4, 2013, 6:33 pm

EP Confusion re: SS C3.1,.3.2, and 3.3

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Elizabeth Ingram  on 

Hi Tristan! I am studying for the LEED 2009 ID+C and am confused regarding the graphics for the above credits and the way the EP is mentioned. They seem to differ.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Jul 4, 2013, 6:17 pm

LEED 2009 ID+C Study Guide Typo? IEQ C2

CI-2009 IEQc2:Increased Ventlilation
posted by  Elizabeth Ingram  on 

Hi! The above lists IEQ C2 as 5 points. Am I misunderstanding this? Is it another strange and wondrous EP or ID credit, or suite of credits?

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Thu Jul 4, 2013, 6:09 pm

Can green power used on another project?

Performing LEED Green Power Calculations
posted by  Shenhao Li  on 
We are doing a LEED submission for a project in china. Can we buy green power for this project to get the credit, but get some preferential policy for another project in USA?
4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jul 4, 2013, 2:09 am

Tenant spaces Completion

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Joel Cheely  on 

We are renovating urban buildings into apartments and speculative retail/commercial space. Some of the retail/commercial space will be constructed prior to application and some won't.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jul 2, 2013, 10:16 pm