Forum quick links
recirculation
NC-2009 EAc1:Optimize Energy Performanceposted by jaume balana on
Is it mandatory to have recirculation (for a system 4)?
Project Registration and Design Submittal
posted by Gaston Viau on
It will be my first time registering a project so I have some doubts I would like to share with you. Our project is a NC commercial building.
Adhesive category for Foster 85-20
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by cathy keagle on
What is the appropriate category for Foster 85-20? Our contractor told us that it was Special Purpose Contact Adhesive. And how do we verify this?
Defining the baseline
NC-2009 EAc5:Measurement and Verificationposted by Gustav Alfaro on
Hi to all: Please help me to clarify how the baseline model is defined for the M&V plan, it is clear that for the "actual case" the proposed model created for the EAc1 must be calibrated based
With Specialty expired
posted by Bill Swanson on
I know several people who opted in but never completed the 30 hours of continuing education in the required 2 year period and now have expired specialties.
LEED Interpretation #10134 as applied to fan coils
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Silvia Ruiz on
Hi, Would a project be eligible to apply for this credit if the scope of work includes the provision and installation of 100% of the fan coils serving the certifiable space, even if they don't ha
EP Confusion re: SS C3.1,.3.2, and 3.3
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Elizabeth Ingram on
Hi Tristan! I am studying for the LEED 2009 ID+C and am confused regarding the graphics for the above credits and the way the EP is mentioned. They seem to differ.
LEED 2009 ID+C Study Guide Typo? IEQ C2
CI-2009 IEQc2:Increased Ventlilationposted by Elizabeth Ingram on
Hi! The above lists IEQ C2 as 5 points. Am I misunderstanding this? Is it another strange and wondrous EP or ID credit, or suite of credits?
Can green power used on another project?
posted by Shenhao Li on
Tenant spaces Completion
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Joel Cheely on
We are renovating urban buildings into apartments and speculative retail/commercial space. Some of the retail/commercial space will be constructed prior to application and some won't.