Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Constant volume system in some areas, VAV in others

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Muhammad Faisal Azizullah Jaffar  on 

Hello, my project is a campus golf course community project in Qatar. One of the buildings in the master site, the clubhouse, is mixed-use: part hotel, part retail, part restaurants etc.

3
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Tue Oct 1, 2013, 6:31 pm

Clarification

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Leandro Silva  on 

Please help with this scenario: Core and Shell project with 8 tenants (light manufacturing). Goal of achieving EAc5.1 and EAc5.2. The developer will meter total energy use of the Core areas and a

4
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Tue Oct 1, 2013, 1:38 pm

LEED Matrix

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Oleg Petryuchenko  on 

we have some spaces that excluded from 8.1 according to matrix such as lobby, brake room.. but they are properly daylit (10-500fc) based on AGI calcs.

3
Mon Sep 30, 2013, 9:31 pm

Future development in the same LPB

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Marcio Alberto Casado Pereira  on 

Hi folks, In need of some light on a review we received. We have a multiple buldings Project. there are 4 LPBs inside of the LCB.

2
Mon Sep 30, 2013, 7:24 pm

District heating/cooling and On-site renewables

ND-v2009 GIBc12:District heating and cooling
posted by  Colin Day  on 

Hello Eliot, The project I am working on is a mixed-use (mostly residential) neighborhood. There will be solar PV on every home as well as ground source heat pumps.

4
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Sep 30, 2013, 4:38 pm

How can I provide blower door test results before occupancy?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  adi ashkenazi  on 

Hi, On the credit form I must upload blower door test results but this credit is a design phase credit and the test is only after construction is complete.

3
Fri Sep 27, 2013, 8:58 pm
3
Default Avatar
Senior Sustainability Consultant
Steven Winter Associates, Inc.
LEEDuser Basic Member
72 thumbs up
Fri Sep 27, 2013, 6:30 pm

Rainwater cistern and greenroof

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Mike D  on 

Our project will capture rainwater for the irrigation of the green roof and for the flushing of WCs in the building.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Sep 27, 2013, 4:05 pm

CO2 sensors in return ductwork?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Maura Adams  on 

The CO2 sensors for this science building are in the return ductwork, not 3-6' from the floor. I'm telling the team that this is clearly not in compliance, but the Honeywell rep insists otherwise.

3
Default Avatar
Owner / Energy Engineer / Sustainability Consultant
Sustainnovations, LLC
LEEDuser Basic Member
94 thumbs up
Fri Sep 27, 2013, 3:50 pm

Same product, multiple contractors

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Lewis Hewton  on 

Hi all, quick query regarding filling out the online submission form: If we have multiple contractors (i.e.

2
Partner, Architecture & Sustainability
DIALOG
LEEDuser Premium Member
449 thumbs up
Fri Sep 27, 2013, 3:02 am