Topic | Recent |
---|---|
EQ6.2 Return air flowLEED for Homes (LEED-H) Forumposted by mike diess on Feb 1, 2011, 11:25 am
EQ6.2 a) states:"Size the opening to 1 sq inch per cfm of supply air (this area may include free area undercut below door)." When using a grille are they specifying gross or net area? Our firm... Last reply: Rob Moody, Mar 24, 2011, 8:02 pm |
|
Roof with solar panelsEBOM-2009 SSc7.2: Heat island effect - roofposted by Matthew Perna on Dec 30, 2010, 9:08 am
Does anyone know why a roof covered with solar panels wouldn't apply to credit 7.2: Heat Island Reduction--Roof? The USGBC allows it to be used toward credit 7.1 where a roof with solar panels... Last reply: David Posada, Mar 24, 2011, 12:41 pm |
|
GuaduaNC-2009 MRc6: Rapidly Renewable Materialsposted by Carlos Alberto Hoyos Soto on Mar 24, 2011, 10:23 am
I want to know if anyone has use guadua, and if it is considered as rapidly renewable material, thanks. Last reply: Tristan Roberts, Mar 24, 2011, 11:30 am |
|
Innovative water efficiencyEBOM-2009 IOc1: Innovation in Operationsposted by Melissa Merryweather on Mar 24, 2011, 12:00 am
A project considering LEED... Last reply: David Hubka, Mar 24, 2011, 7:58 am |
|
Two fan systems on a common supply riserEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Dave Munn on Dec 4, 2009, 2:30 pm
We are working on a building with a supply fan both at the top of a common supply duct riser (penthouse) and another supply fan in the lower level connected to the base of the common riser. Both... Last reply: Jalal Avades, Mar 24, 2011, 1:47 am |
|
Multiple AHUs serving a single spaceEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Zachary Goodnough on Feb 23, 2011, 1:47 am
The building I am working on has a large main sales area which is served by 8 AHUs, all bringing in 100% fresh air. In this case, is the proper protocol to first divide total peak customer and... Last reply: Zachary Goodnough, Mar 23, 2011, 11:07 pm |
|
Applicability of Pilot CreditsUsing the LEED Pilot Credit Libraryposted by Abena Darden on Mar 18, 2011, 5:55 pmTristan-We've just registered for Pilot Credit 11 in a LEED for Homes project but I notice on the applicability table above this credit cannot be used for Homes. Is this a hard and fast USGBC... Last reply: Batya Metalitz, Mar 23, 2011, 5:19 pm |
|
EAp2 Equipment MotorsCI-2009 EAp2: Minimum Energy Performanceposted by Eric Claycamp on Mar 22, 2011, 11:23 am
For a LEED CI project that includes a fitness center, do you count the motors in the treadmills and cross trainers? No fitness equipment I have found is Energy Star rated. These loads can be... Last reply: David Hubka, Mar 23, 2011, 5:09 pm |
|
EAc1 required 2 pointsCI-2009 EAp2: Minimum Energy Performanceposted by Jennifer Berthelot-Jelovic on Mar 22, 2011, 3:41 pm
I know that for EAc1 there was a requirement that "All LEED for New Construction project registered after June 26, 2007 are required to achieve at least two (2) points." Since I am working on a... Last reply: David Hubka, Mar 23, 2011, 5:05 pm |
|
Design Engineer SignatoryCI-2009 EAp2: Minimum Energy Performanceposted by Sundararaj Subburaman on Mar 23, 2011, 3:11 am
Please let me know if the HVAC Designer will be representing the Design Engineer Signatory for the EA P2? If not who will be the Design Engineer - MEP designer? Last reply: David Hubka, Mar 23, 2011, 5:00 pm |