LEED Boundary on large site multiple buildings- 1 certifiable

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Alexander Clark on Apr 5, 2016, 10:17 pm

I have a project that is on a 50 acre site that will be all developed. The project will have (7) structures on the site. Six of the structures are canopies, sheds or buildings that do not meet...

FTE- Healthcare buildings

Healthcare-v2009 PIf3: Occupant and Usage Data
posted by VICTOR MORENO on Apr 6, 2016, 5:35 am

In our Healthcare project, there are workers during the morning, afternoon and evening, with a time of 8 hours each.

if I count the...

Street trees in a winter resort

Pilot-Credits PC14: Walkable Streets
posted by John Zehren on Apr 7, 2016, 6:48 pm

Our project is bounded by a stream on one side, a road on another and 2 sides are on an active pedestrian mall (non motorized) with retail and restaurants meeting the height to width ratio. This...

n/a

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Donna Juselis on Apr 8, 2016, 5:59 pm

deleted

new LEED Online forum

General forums
posted by Tristan Roberts on Apr 10, 2016, 11:44 am

Hi! We have a new, central forum for keeping track of LEED Online issues and discussing updates. Please use this LEED Online forum to post and...

new LEED Online forum

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Tristan Roberts on Apr 10, 2016, 11:47 am

Hi! We have a new, central forum for keeping track of LEED Online issues and discussing updates. Please use this LEED Online forum to post and...

Wastewater

NC-2009 WEc3: Water Use Reduction
posted by Alejandro Macias on Apr 11, 2016, 5:54 pm

I m using the "water use reductions calculator" to document the WEp1 and WEc3. But in the project im working we will be reusing waste water for the WC and urinal flushing. How can I document the...

Energy Rater

LEED for Homes (LEED-H) Forum
posted by Gustavo De las Heras Izquierdo on Apr 11, 2016, 11:48 pm

Hallo, we want to certify a home outside the U.S. We would like to avoid incorporating an Energy Rater to the verification team (credits EAc2 and EAc5) because it would increase the certification...

Sediment trap outside the project boundary

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Gabriela Mesquita on Apr 13, 2016, 11:22 pm

It plans to build a building in a very broad field of the same owner. The LEED Boundary was defined based on the area that is planned to disrupt. There is a pond of water accumulation built many...

MPR3- Hotel in Mixed Use Building

CI-2009 MPR3: Must use a reasonable site boundary
posted by Sara Zoumbaris on Apr 14, 2016, 10:24 am

Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants. On the ground floor is a restaurant parallel to our Hotel Lobby ,...