LEED Boundary on large site multiple buildings- 1 certifiableHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by Alexander Clark on Apr 5, 2016, 10:17 pm
I have a project that is on a 50 acre site that will be all developed. The project will have (7) structures on the site. Six of the structures are canopies, sheds or buildings that do not meet... |
|
FTE- Healthcare buildingsHealthcare-v2009 PIf3: Occupant and Usage Dataposted by VICTOR MORENO on Apr 6, 2016, 5:35 am
In our Healthcare project, there are workers during the morning, afternoon and evening, with a time of 8 hours each. if I count the... |
|
Street trees in a winter resortPilot-Credits PC14: Walkable Streetsposted by John Zehren on Apr 7, 2016, 6:48 pm
Our project is bounded by a stream on one side, a road on another and 2 sides are on an active pedestrian mall (non motorized) with retail and restaurants meeting the height to width ratio. This... |
|
n/aNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Donna Juselis on Apr 8, 2016, 5:59 pm
deleted |
|
new LEED Online forumGeneral forumsposted by Tristan Roberts on Apr 10, 2016, 11:44 am
Hi! We have a new, central forum for keeping track of LEED Online issues and discussing updates. Please use this LEED Online forum to post and... |
|
new LEED Online forumLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Tristan Roberts on Apr 10, 2016, 11:47 am
Hi! We have a new, central forum for keeping track of LEED Online issues and discussing updates. Please use this LEED Online forum to post and... |
|
WastewaterNC-2009 WEc3: Water Use Reductionposted by Alejandro Macias on Apr 11, 2016, 5:54 pm
I m using the "water use reductions calculator" to document the WEp1 and WEc3. But in the project im working we will be reusing waste water for the WC and urinal flushing. How can I document the... |
|
Energy RaterLEED for Homes (LEED-H) Forumposted by Gustavo De las Heras Izquierdo on Apr 11, 2016, 11:48 pm
Hallo, we want to certify a home outside the U.S. We would like to avoid incorporating an Energy Rater to the verification team (credits EAc2 and EAc5) because it would increase the certification... |
|
Sediment trap outside the project boundaryNC-2009 SSp1: Construction Activity Pollution Preventionposted by Gabriela Mesquita on Apr 13, 2016, 11:22 pm
It plans to build a building in a very broad field of the same owner. The LEED Boundary was defined based on the area that is planned to disrupt. There is a pond of water accumulation built many... |
|
MPR3- Hotel in Mixed Use BuildingCI-2009 MPR3: Must use a reasonable site boundaryposted by Sara Zoumbaris on Apr 14, 2016, 10:24 am
Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants. On the ground floor is a restaurant parallel to our Hotel Lobby ,... |