It plans to build a building in a very broad field of the same owner. The LEED Boundary was defined based on the area that is planned to disrupt. There is a pond of water accumulation built many years ago, without a specific use to date. This gap is outside the LEED Boundary. My question is if I can make a Control Plan Erosion acceptable to LEED, which consider sending muddy water by gravity to this lagoon which is about 82 feet, to sediment the solids washed away storm runoff.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.