Log in
Forum
Topic

NO MARKED BICYCLE LANES

CS-v4 LTc6: Bicycle facilities
posted by Marine Petrosyan on Aug 22, 2023, 5:01 am

Hi, All!

Our project works to fully comply with the Bicycle Facilities credit. But the whole problem is, that due to the historical infrastructure development specifications, we do not...

Last reply: Marine Petrosyan, Aug 24, 2023, 2:31 am

IN- GREEN BUILDING EDUCATION

CS-v4 INc1: Innovation
posted by Dulce Solis on Oct 30, 2023, 12:29 pm

Has anyone implemented the second strategy in the guide "The development of a manual, guideline or case study to inform the design of other buildings based on the successes of this project."?...

Last reply: emily reese moody, Apr 18, 2024, 3:58 pm

Chilled Water Use for part of a floor

CI-v4 EAc3: Advanced Energy Metering
posted by Annie Argento on Jun 5, 2015, 5:09 pm

How would a tenant who leases part of a floor in a high rise building meter their use of chilled water from the...

Last reply: Marcus Sheffer, Mar 4, 2016, 11:10 am

EA-p2: EnergyStar TargetFinder Score

CI-v4 EAp2: Minimum Energy Performance
posted by Nikhilesh Srinivasan on Jun 26, 2017, 1:47 pm

My project is an office tenant fitout (1 floor in a high-rise building). We are going with Option 2 - Prescriptive Compliance and we are relying on...

Last reply: Oliver Bate, Sep 6, 2017, 4:21 am

Light Reflectance values

CI-v4 EQc6: Interior lighting
posted by Karen Elliott on Jul 13, 2017, 5:38 am

How do you calculate the light refectance value of a glass partition? Also patterned wallpapers, manifests and screen prints where the information is not available from the manufacturer?
...

Last reply: Karen Elliott, Jun 12, 2018, 5:59 am

Pilot Credit Required or not

CI-v4 INc1: Innovation
posted by Len Sciarra on Sep 6, 2017, 12:29 am

With the Innovation in Design credit for LEED-CI v4, the reference guide indicates that you can achieve all 5 credits thru a combination of innovation and exemplary performance credits (option 3...

Last reply: emily reese moody, Apr 19, 2018, 12:43 pm

One Tenant- two spaces across a public corridor- can this be certified as one project?

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Helen Kessler on Oct 31, 2017, 2:16 pm

The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor.  Seems to me this is no different from a tenant that is on multiple...

Last reply: Dave Hubka, Jan 3, 2024, 8:25 am

Envelope of a restaurant in an existing building

CI-v4 EAp2: Minimum Energy Performance
posted by Javier Manzanero on Nov 19, 2017, 10:30 am

I'm working in a restaurant to be located in a space contained in an existing building. This space has 2 facades to outdoor space, but the owner don't let us modify any element of the existing...

Last reply: Javier Manzanero, Nov 20, 2017, 1:19 pm

Genera Emissions Evaluation- Hollow Metal Doors and Frames

CI-v4 EQc2: Low-emitting materials
posted by Loretta Maine on Jan 10, 2018, 12:52 pm

Does Hollow Metal Doors and Frames need to be included in the Low Emitting Materials, Option 1. Product Category Calculations? Would it fall under the Ceilings, Walls, Thermal, and Acoustical...

Last reply: Chloe Bendistis, Nov 20, 2018, 12:13 pm

Grout Requirements

CI-v4 EQc2: Low-emitting materials
posted by Michelle Rosenberger on Feb 12, 2018, 4:40 pm

Does grout still need to meet low emitting requirements? If so, both...

Last reply: Stacey Olson, Apr 7, 2023, 3:09 pm