Concerning Signatories

NC-2009 EAc3: Enhanced Commissioning
posted by Omar Elrawy on Jan 23, 2017, 8:12 am

I need to know if the two signatories on the EA CREDIT 3: ENHANCED COMMISSIONING - LEEDOnline form are to be signed by the...

Last reply: Scott Bowman, Jan 30, 2017, 5:55 pm

Platted Lots by Government

NC-v4 LTc2: Sensitive land protection
posted by soha yamani on Dec 31, 2016, 9:44 am

Dear All,
If a project lies on a platted plot specified by government (surrounded by streets from four or three sides ) in a desert land : is this considered previously developed plot ?...

Last reply: Tristan Roberts, Jan 23, 2017, 3:16 pm

VOC product category

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by soha yamani on Aug 8, 2016, 10:05 am

we are trying to identify a product to check its...

Last reply: Jon Clifford, Aug 9, 2016, 6:52 pm

voc for Damp proofing paints under ground

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by soha yamani on Jun 15, 2016, 6:30 am

Hi all ,
do damp proofing paints that are used to paint concrete foundations, retaining walls, and column necks are considered inside the building ? as they will be under back fill and...

Last reply: Jon Clifford, Jul 2, 2016, 12:44 pm

Signed Contract with the CxA

NC-2009 EAc3: Enhanced Commissioning
posted by Mohamed M. Abd Elhameed on Jul 1, 2015, 4:22 am

We are pursuing LEED Certification for a 476921.20 sq ft Mixed Use Office Building in Egypt.

Building Owner is a multinational design firm who do both tasks, the project design and the...

Last reply: Scott Bowman, Jun 30, 2016, 4:51 pm

Maximum Temperature

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Omar Elrawy on May 8, 2016, 8:07 am

Dear All,
I need to ensure that in the 60/60 rule, I do not find anything about the maximum indoor temperature during flush-out, please advice if I can maintain any indoor temperature as...

Last reply: Dave Hubka, May 12, 2016, 8:21 am

Campus for a gated residential/commercial compound versus ND

LEED Guidance for Campuses and Multiple Buildings
posted by ABDELHAMID BESHARA on Feb 23, 2016, 3:46 pm

We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models. The buildings are distributed on two main pieces of land of equal areas separated...

Last reply: Eric Anderson, Apr 30, 2016, 12:23 pm

Campus approach in a gated residential compound or ND?

LEED Rating System Selection
posted by ABDELHAMID BESHARA on Feb 23, 2016, 3:38 pm

We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models. The buildings are distributed on two main pieces of land of equal areas separated...

Last reply: Eliot Allen, Apr 11, 2016, 11:21 am

Certificate timeline

ND-Plan-v4 GIBc1: Certified green buildings
posted by soha yamani on Mar 22, 2016, 7:26 am

I am working on a neighborhood project in Egypt , and we have been thinking to use LEED v4 for ND Plan , it is stated on usgbc official website that Plan: certification is available to your...

Last reply: Eliot Allen, Mar 22, 2016, 11:08 am

Basement That Extends to Plot line

NC-2009 WEc1: Water Efficient Landscaping
posted by Omar Elrawy on Feb 24, 2016, 12:20 pm

Hi,
My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area. And the design includes...