Forum quick links
shuttle buses
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Weidong Luo on
there are 8 stops/stations within 1 mile radius form our project serving 47 public bus/light rail lines, and 2 of them are municipal public transportation hubs that connect the vicinity to downtown
Coat area - regularly occupied?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Eric White on
We have an K-6 school project which is mostly views-compliant. One issue we are having in getting above 90% views requirement is the coat area at the rear of the classroom.
Autocontrol vs smart sensor-activated faucets and duration times
NC-v4 WEp2:Indoor water use reductionposted by Heather DeGrella on
Per the LEEDv4 Reference Guide "Duration-based savings from auto-control faucets w/ automatic fixture sensors or metering controls are no longer allowed in the design case.
Updates to LEEDOnline forms November-December 2014
posted by Deborah Lucking on
It is wonderful that the new leedonline includes a feature that provides an update on new activities by various team members.
LEED Core&Shell?
posted by Lise Dannesboe on
Hi! Our building is a renovation project in which the developer does a total refurbishment of building base systems and building shell. The building is mainly office building, a small part appr.
EAc2.3 - Ongoing Cx forms
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Alexis Voeltner on
Hi Hannah, do you have an example of what the on-going commissioning test form should look like?
Ceramic wall tile adhesives and grouts
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Nelina Loiselle on
Hello, This may seem like a stupid question, but I am working on a project that has porcelain wall tile being installed in bathrooms and I'm not sure how this is supposed to be listed under IEQc4.
What does LEED consider as Sitework?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Erika Duran on
Project sitework and stabalization techniques were implemented during the beginning stages of the project and followed our ESC plan as well as local jurisdiction requirements.
Natural ventilation for residential
CS-2009 IEQp1:Minimum IAQ Performanceposted by mai elly on
HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.
Entering nonregularrly occuoied spaces in IEQp1 calculator
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores and sim