shuttle buses

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Weidong Luo  on 

there are 8 stops/stations within 1 mile radius form our project serving 47 public bus/light rail lines, and 2 of them are municipal public transportation hubs that connect the vicinity to downtown

1
Mon Feb 9, 2015, 3:05 am

Coat area - regularly occupied?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Eric White  on 

We have an K-6 school project which is mostly views-compliant. One issue we are having in getting above 90% views requirement is the coat area at the rear of the classroom.

1
Tue Jan 20, 2015, 1:16 pm

Autocontrol vs smart sensor-activated faucets and duration times

NC-v4 WEp2:Indoor water use reduction
posted by  Heather DeGrella  on 

Per the LEEDv4 Reference Guide "Duration-based savings from auto-control faucets w/ automatic fixture sensors or metering controls are no longer allowed in the design case.

1
Thu Jan 29, 2015, 10:27 pm

Updates to LEEDOnline forms November-December 2014

General forums
posted by  Deborah Lucking  on 

It is wonderful that the new leedonline includes a feature that provides an update on new activities by various team members.

0

LEED Core&Shell?

LEED Rating System Selection
posted by  Lise Dannesboe  on 

Hi! Our building is a renovation project in which the developer does a total refurbishment of building base systems and building shell. The building is mainly office building, a small part appr.

1
Fri Nov 27, 2015, 6:27 pm

EAc2.3 - Ongoing Cx forms

EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioning
posted by  Alexis Voeltner  on 

Hi Hannah, do you have an example of what the on-going commissioning test form should look like?

1
Tue Jan 20, 2015, 6:52 pm

Ceramic wall tile adhesives and grouts

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Nelina Loiselle  on 

Hello, This may seem like a stupid question, but I am working on a project that has porcelain wall tile being installed in bathrooms and I'm not sure how this is supposed to be listed under IEQc4.

1
Wed Jan 21, 2015, 12:58 am

What does LEED consider as Sitework?

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Erika Duran  on 

Project sitework and stabalization techniques were implemented during the beginning stages of the project and followed our ESC plan as well as local jurisdiction requirements.

1
Fri Jan 23, 2015, 1:07 pm

Natural ventilation for residential

CS-2009 IEQp1:Minimum IAQ Performance
posted by  mai elly  on 

HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.

1
Thu Dec 10, 2015, 3:01 pm

Entering nonregularrly occuoied spaces in IEQp1 calculator

NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores and sim

1
Wed Jan 21, 2015, 10:18 pm