Does type of signage matter?CI-v4 EQp2: Environmental tobacco smoke controlposted by Edgar Arevalo on Feb 2, 2024, 5:13 pm
Does it matter the type of signage that's displayed at the entries of the building? I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly states... |
|
Modeling Proposed DHW with InsulationNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Jan 31, 2024, 2:07 pm
Hi I am Modeling a... Last reply: Marcus Sheffer, Jan 31, 2024, 5:32 pm |
|
Onsite and Offsite Both?Pilot-Credits SSpc83: Offsite Financial Support for Habitat Protectionposted by Umesh Atre on Aug 25, 2023, 1:09 pm
Hi - Are projects that are pursuing the onsite habitat protection/restoration credit allowed to go for this Pilot in addition, or is this considered to be an alternate compliance path only?... Last reply: Michaël Briffaz, Jan 31, 2024, 10:57 am |
|
Hiring- LEED Project AdministratorHelp Wanted: LEED-related Jobsposted by Trisha Highnote on Jan 17, 2024, 11:12 am
Rennell Associates, LLC, is seeking a candidate to join our team as LEED® PROJECT ADMINISTRATOR. We seek a person with three or more years of experience in sustainable design and construction to... |
|
Baseline ExamplePilot-Credits IPpc93: Prevention through designposted by Logan McNeil on Mar 22, 2019, 5:48 pm
Our project (UCSF Block 33, SF CA) has found this credit to be worthwhile to pursue, as safety should live in every aspect of a construction project. However, the team noted that it would have... Last reply: Dionisio Franca, Jan 15, 2024, 3:41 am |
|
MasticNC-v4.1 EQc4: Indoor air quality assessmentposted by Michelle Lockert on Jan 11, 2024, 2:04 pm
Can anyone tell me if it is okay to utilize mastic “outside” the building envelope? Thank you. Last reply: Gregor Braugman, Jan 13, 2024, 11:04 pm |
|
Distance to entrance within a large campusNC-v4.1 LTc6: Bicycle facilitiesposted by on Nov 16, 2023, 3:35 pm
Working in predesign on a new construction building within a large site, wherein the site has only one public entrance. That entrance is an existing welcome center, and bicycles are not permitted... Last reply: Luisa Tonelli, Jan 12, 2024, 7:35 am |
|
View Type 1 with non-continuous window glazingNC-v4 EQc8: Quality Viewsposted by Edgar Arevalo on Jan 8, 2024, 4:53 pm
I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous. The wall space between windows are... Last reply: Edgar Arevalo, Jan 11, 2024, 1:46 pm |
|
"Weighted sum of non-roof and roof measures" IssueNC-v4 SSc5: Heat Island Reductionposted by Edgar Arevalo on Jan 10, 2024, 10:48 am
Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and... Last reply: Edgar Arevalo, Jan 11, 2024, 12:43 pm |
|
Location of outside airflow measuring station inside the HVAC unitNC-v4 EQp1: Minimum indoor air quality performanceposted by Edgar Arevalo on Jan 4, 2024, 1:15 pm
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engineer... Last reply: Edgar Arevalo, Jan 5, 2024, 10:05 am |