Forum quick links
Space-by-Space Method / Exceptions to Interior Ligtiing Power Allowance
CI-v4 EAp2:Minimum energy performanceposted by James Pack on
Hi
Material Quantity Input into EC3
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Kelli Kimura on
Hi all,
Process or non-process? Kitchen Hood Exhaust and Makeup Air
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I thought I recalled reading that the HVAC energy related to a commercial kitchen hood was considered Process Energy.
Conflicting Directions
NC-v4.1 EQc2:Low-Emitting Materialsposted by Brianne Grace on
I'm in the process of getting 3 Campus projects Certified. All of which are virtually the same, just with different quantities of projects included. Each project used virtually the same
polyisocyanurate roof insulation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Allen Cornett on
Does polyisocyanurate roof insulation on top of a concrete or metal deck need to be included in the documentation of the low-emitting materials insulation category?
Circular Products -Pilot Credit Attempt
Pilot-Credits MRpc131:Circular Productsposted by Patty Lloyd on
Hello, I am attempting this pilot credit and am finding a couple of the pathways to be difficult to achieve.
What qualifies as a carshare program?
NC-v4.1 LTc7:Reduced Parking Footprintposted by Jill Kurtz on
Do we have any idea of what qualifies as "car share" program under option 3? We are helping design a buildnig on a golf course and there are vehicles for employees to use around the facility.
Professional/Private Sports Field as Open Space?
NC-v4 SSc3:Open spaceposted by Angi Rivera on
We have a stadium project that is open air, so the grass turf field is not covered. However, the field is not publicly accessible at any time.
Option 1: Climate Related Risk Management Planning Step
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Marina Rullo on
Our firm pursued this credit for a project site in Baltimore, MD. I found that the prerequisite and Option 1 overlap a great deal, especially when they are presented in the same worksheet.
C&DWM Campus credit
NC-v4 MRc5:Construction and demolition waste managementposted by Geoffrey Brock on
The LEED reference guide has the C&DWM Planning Pre-req as eligible for Campus credit, but the actual C&DWM credit has Campus INeligible (both are eligible for Group). Why?!