Process or non-process? Kitchen Hood Exhaust and Makeup Air

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Scott  on 

I thought I recalled reading that the HVAC energy related to a commercial kitchen hood was considered Process Energy.

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 29, 2025, 10:33 pm

Conflicting Directions

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Brianne Grace  on 

I'm in the process of getting 3 Campus projects Certified.  All of which are virtually the same, just with different quantities of projects included.  Each project used virtually the same

6
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu May 29, 2025, 10:08 pm

polyisocyanurate roof insulation

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Allen Cornett  on 

Does polyisocyanurate roof insulation on top of a concrete or metal deck need to be included in the documentation of the low-emitting materials insulation category?

4
Thu May 29, 2025, 9:10 pm

Circular Products -Pilot Credit Attempt

Pilot-Credits MRpc131:Circular Products
posted by  Patty Lloyd  on 

Hello, I am attempting this pilot credit and am finding a couple of the pathways to be difficult to achieve.

0

What qualifies as a carshare program?

NC-v4.1 LTc7:Reduced Parking Footprint
posted by  Jill Kurtz  on 

Do we have any idea of what qualifies as "car share" program under option 3? We are helping design a buildnig on a golf course and there are vehicles for employees to use around the facility.

3
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu May 29, 2025, 7:09 pm

Professional/Private Sports Field as Open Space?

NC-v4 SSc3:Open space
posted by  Angi Rivera  on 

We have a stadium project that is open air, so the grass turf field is not covered. However, the field is not publicly accessible at any time.

0

Option 1: Climate Related Risk Management Planning Step

Pilot-Credits IPpc98:Assessment and Planning for Resilience
posted by  Marina Rullo  on 

Our firm pursued this credit for a project site in Baltimore, MD. I found that the prerequisite and Option 1 overlap a great deal, especially when they are presented in the same worksheet.

6
Thu Aug 28, 2025, 3:16 pm

C&DWM Campus credit

NC-v4 MRc5:Construction and demolition waste management
posted by  Geoffrey Brock  on 

The LEED reference guide has the C&DWM Planning Pre-req as eligible for Campus credit, but the actual C&DWM credit has Campus INeligible (both are eligible for Group). Why?!

5
Default Avatar
LEED Manager
Bechtel
LEEDuser Basic Member
0 thumbs up
Wed May 28, 2025, 5:30 pm