Water Efficiency (WE) – Public Comment Draft, Page 17LEED v5 O&M Existing Buildings Public Commentsposted by Diane Bauer on May 16, 2024, 7:45 pm
From an operations perspective, we believe the Water, Energy, Waste and IEQ credit categories should have a more balanced point allocation. With increasing concerns over access to fresh water,... |
|
Point distribution in Innovation creditNC-v4 INc1: Innovationposted by Ahmed Abdul Rahman on May 17, 2024, 7:11 am
Hallo All, I have a question about INc1. As per LEED, to achieve maximum 5 points, a project team must achieve at least one pilot credit, at least one innovation credit and no more... Last reply: Denise Bevilaqua, May 17, 2024, 8:28 am |
|
v5 O&M: Decarbonization and Efficiency PlansLEED v5 O&M Existing Buildings Public Commentsposted by Stephane Larocque on May 14, 2024, 9:13 am
Firstly, I’d like to say that I’m very glad to finally see decarbonization planning explicitly addressed within the LEED framework, it feels like a long time coming and absolutely necessary to... Last reply: Katelyn Lawson, May 17, 2024, 12:24 am |
|
Option 2- Carshare, requirementsNC-v4.1 LTc7: Reduced parking footprintposted by Ricardo Sá on Feb 11, 2020, 11:47 am
Dear All, I have a question regarding Option 2 – Carshare. Which are the requirements of a parking place in order to be classified as a carshared... Last reply: Priscillia Champagne, May 16, 2024, 3:21 pm |
|
Receptacles in multifamily midrise buildingPilot-Credits SSpc129: Comprehensive Compostingposted by Emma McKay on May 16, 2024, 2:14 pm
Hi all, I have a project that is pursuing this pilot credit, as it aligns with city requirements for separate collection for organic waste. The building is 15 stories, and corridors are... |
|
Materials and Resourced | Optimized Building ProductsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Michael Scharpf on May 16, 2024, 1:40 pm
The big difference to LEED v4 is that this credit only considers NON-STRUCTURAL building products in the optimization process. Why have structural building products been excluded from the... |
|
Materials and Resources | Optimized Building ProductsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Michael Scharpf on May 16, 2024, 1:49 pm
|
|
Proposed Design Demand Control VentilationCI-v4 EAp2: Minimum Energy Performanceposted by Luis Andrade on May 16, 2024, 1:30 pm
Hi all, I have a doubt regarding a CI project. The building is served by Dedicated Outdoor Airflow Systems (DOAS) that serves several floors. Our project is regarding only one floor. As... |
|
Overall LEED v5 commentLEED v5 O&M Existing Buildings Public Commentsposted by Drew Yetter on May 16, 2024, 1:21 pm
Where possible, please integrate all calculators and forms into LEED Online. |
|
LEED v5 BD+C/ID+C Water Efficiency public commentsLEED v5 BD+C/ID+C: Water Efficiency Public Commentsposted by Nadav Malin on Apr 3, 2024, 6:24 amto separate things like drinking fountains and mop sinks. https://leeduser.buildinggreen.com/forum/electric-water-coolers-drinking... https://leeduser.buildinggreen.com/forum/separation-service-sinks-and-in... https://leeduser.buildinggreen.com/forum/ice-machines https://leeduser.buildinggreen.com/forum/submetering-process-water-assis... https://leeduser.buildinggreen.com/forum/water-metering-v40-janitors-clo... https://leeduser.buildinggreen.com/forum/indoor-plumbing-fixtures-and-fi... Log in or register to post comments Paul Sambanis LEEDuser Basic Member May 16, 2024- 4:53 am My name is Paul Sambanis, and I am the Vice President of Sustainability at Sloan, a manufacturer... Last reply: rose gicheru, May 16, 2024, 1:07 pm |