Hi all,

I have a doubt regarding a CI project. The building is served by Dedicated Outdoor Airflow Systems (DOAS) that serves several floors. Our project is regarding only one floor. As per ASHRAE 90.1 - 2010, section 6.4.3.9, DCV controls are only required for spaces with high occupancy density served by systems with 1400 l/s of outdoor airflow or more. We know that each DOAS that serve the building (and the project) have more than 1400 l/s, however, each DOAS provides around 1200 l/s to the floor under certification.

As such, must spaces that have a high occupancy density in our project (as per the 6.4.3.9 section) need to comply with DCV controls?

The doubts is: each system's total outdoor airflow is higher than 1400 l/s (as a total), but each DOAS provides less than that threshold to our project.

Thank you very much in advance!