Forum quick links
Minimum Equipment Efficiency - Table 6.8.1 ASHRAE. VRF system
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello. I am modelling a new building whose cooling system is Variable Refrigerant Flow Systems.
LEED recertification process
EBOM-2009 PIf5:Previously LEED Certified Detailsposted by VICTOR MORENO on
Hi, I have to register a LEED EBOM certified project. I can not find the recertification option in LEED Online. What is the process to follow? If I registry the project in LEED EBOM rating sys
Leed v4- NC of Logistic Center.
NC-v4 EAp2:Minimum energy performanceposted by Helena Garcia on
It is making energy simulation for a logistic center for storage. Local regulations based on European regulations not required to be heated, instead ASHRAE required to be heated. How should we co
Renewable Energy in Template EAp2 (Healthcare)
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello.
Carrier air to water chiller (non standard (ARI) testing)
CS-2009 EAp2:Minimum Energy Performanceposted by David Lazaro on
I would like to check if the Carrier model 30RQ0262 (COPc=2,62 according ARHI test 550/590 despite ASHRAE requires ARI 340/360) will meet that Mandatory Provisions in terms of Equipment Efficiency.
Previously developed sites
NC-2009 PIf2:Project Summary Detailsposted by Raquel Torrente on
We have received the review report of the building.
2 Buildings in a unique Hotel
NC-2009 EAp2:Minimum Energy Performanceposted by Antonio Marquez Briones on
We have one unique boiler, that feeds two buildings inside the LEED boundary of the hotel. Must we do two energy models, with two set of input/output reports?
Interior or Exterior Lighting fixture in residential project
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
We are developing a building energy modeling of a residential building based on 90.1-2007. The dwelling units have exterior areas (balconies) that have luminaires. These luminaires have to be mod
Building Area Method & Space-by-Space Method
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello.
Glare control
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Belén Valladares López on
Hi, We're working in a project trying to achieve this credit by option 3 (measurement). Our façade is an existing curtain wall. There are two different skins.