Forum quick links
Vertical Expansion v. Horizontal Expansion
Healthcare-v4 MRc8:Design for flexibilityposted by Mary Couch on
Hello! I'm working on a project and we can only achieve Modular/Movable Casework, Vertical Expansion and Horizontal Expansion.
Heat Island Reduction: Parking under Cover
Healthcare-v4 SSc5:Heat island reductionposted by Mary Couch on
I am on a project currently where we are pursuing option one of the Heat Island credit, we are curious as to whether we are able to pursue option B as well.
Off site renewable eenergy EAc2
NC-2009 EAc2:On-Site Renewable Energyposted by Richardson Jean-Baptiste on
Hello! I have a project ( a new Science building on a college campus) under NC-2009.
Third-Party Certification and Labels for CHPS
NC-v4 EQc2:Low emitting materialsposted by Sara Greenwood on
Hello, I am working on a project that would like to use a product that has been tested to Section 01350.
How to use Title 24 2016 to comply with LEED 2009 EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Bo Yi on
Hi,
I am doing a LEED 2009 project. The project is in California and complied with Title 24 2016. I am trying to use title 24 to comply the LEED EAc 1. I have two questions.
DES boilers accountable for water metering
NC-v4 WEc4:Water meteringposted by Elyse Dufrene on
If DES boilers have a capacity of more than 500 000 BtuH and that water consumption is metered, can they account to encounter water metering credit requirements?
Reclaim and use steam condensate requirement for indoor water use reduction
NC-v4 WEc2:Indoor water use reductionposted by Elyse Dufrene on
Can you please clarify what is ment by the requirement for steam system : reclaim and use condensate - 100% recovery and reuse. Tks
LEEDv2009 NC SSc2
NC-2009 SSc2:Development Density and Community Connectivityposted by Lina Khan on
Hello Everyone,
Connectivity within a Big Box Store Shopping Centre
ND-v4 SLLc1:Preferred locationsposted by Tim Nabholz on
What is considered an intersection within a parking lot of a Big Box Store shopping centre.
Alternative Bike Network
Schools-NC-v4 LTc6:Bicycle facilitiesposted by Danielle Waters on
The school zone is located on a road with a 30 mph speed limit sign.