Verified Construction & Demo Recycling Rates - Project vs. Facility

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Amanda Atkinson  on 

"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility."

1
Tue Jul 2, 2019, 1:06 am

Can sink use dictate type of sink (kitchen/bathroom ) for determining indoor water use reduction rates?

Retail-CI-v4 WEp1:Indoor water use reduction
posted by  Kevin Gilleran  on 

If a sink located in a bar area is used only for washing hands can it be counted as a bathroom sink, or does the sink location dictate its type? 

1
Sun Nov 11, 2018, 3:28 am

Campus District Cooling Tower

NC-v4 WEc3:Cooling tower water use
posted by  Heather Zeto  on 

Our project is on a University campus, which utilizes a Distrcit Plant.  There is no Cooling Tower directly within our project, but there is one at the District Plant.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Tue Oct 2, 2018, 6:45 pm

Enchanced Cx - District/Campus System Guidance - Floor Area trigger

NC-v4 EAc1:Enhanced commissioning
posted by     on 

One of the triggers of the upstream equipment Cx requirements for EAc1 is that the "project building's gross floor area is greater than 50,000 square feet." Does this 50,000 GSF trigger refer to th

0

Option 4 - whole building life cycle assessment

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Chloe Naese  on 

Hello, could this credit be pursued for a major renovation of a building, or does it only apply to new construction? Thanks!

3
Senior Sustainability Consultant
Steven Winter Associates
LEEDuser Premium Member
9 thumbs up
Tue Oct 2, 2018, 1:11 pm

Shuttle between building and secured site entrances

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  J Douglas Dietrich  on 

Distance from LEED building to public transit stops is too far to meet requirements, however distance from the guardhouse gate controlling access to the secured site on which the LEED building is l

4
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Fri Sep 28, 2018, 10:48 am

SSc6

EBOM-v4 SSc6:Site improvement plan
posted by  Yaretzy Charo  on 

What does it mean by documentation of existing site conditions? 

3
Thu Sep 27, 2018, 9:08 pm

Asphalt with Recycled content (RAP)

NC-2009 MRc4:Recycled Content
posted by  Rick Alfandre  on 

Has anyone used Ashpalt with recycled asphalt?  Reading the forums, it seems it will apply, but I'm having trouble determining what possible percentage of recycled content (pre or post consume

2