LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
Pilot Credit Closed
This pilot credit is closed to new registrations
To reduce environmental impact through building product and material selection, promote transparency, and encourage market transformation in the field of materials and material ingredients.
Requirements
Project teams may pursue the entire LEED v4 Materials and Resources category in place of the MR credits from LEED v2009. All prerequisites must be met.
- Storage and collection of recyclables (Required)
- Construction and demolition waste management planning (Required)
- Building life-cycle impact reduction Up to 5 points
- Building product disclosure and optimization - environmental product declarations Up to 2 points
- Building product disclosure and optimization - sourcing of raw materials Up to 2 points
- Building product disclosure and optimization - material ingredients Up to 2 points
- Construction and demolition waste management Up to 2 points
If project earns ____ v4 points |
Receives_____ v2009 points |
---|---|
1 |
1 |
2 |
2 |
3 |
3 |
4 |
5 |
5 |
6 |
6 |
7 |
7 |
9 |
8 |
10 |
9 |
11 |
10 |
12 |
11 |
13 |
12 |
14 |
13 |
14 + 1 IN |
Submittals
Changes
- Closed for registration on 8/12/2022
Not pursuing this pilot but have a comment you'd like to share with USGBC?
Click here to submit your commentWhat does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
Pilot Credit Closed
This pilot credit is closed to new registrations
To reduce environmental impact through building product and material selection, promote transparency, and encourage market transformation in the field of materials and material ingredients.
Requirements
Project teams may pursue the entire LEED v4 Materials and Resources category in place of the MR credits from LEED v2009. All prerequisites must be met.
- Storage and collection of recyclables (Required)
- Construction and demolition waste management planning (Required)
- Building life-cycle impact reduction Up to 5 points
- Building product disclosure and optimization - environmental product declarations Up to 2 points
- Building product disclosure and optimization - sourcing of raw materials Up to 2 points
- Building product disclosure and optimization - material ingredients Up to 2 points
- Construction and demolition waste management Up to 2 points
If project earns ____ v4 points |
Receives_____ v2009 points |
---|---|
1 |
1 |
2 |
2 |
3 |
3 |
4 |
5 |
5 |
6 |
6 |
7 |
7 |
9 |
8 |
10 |
9 |
11 |
10 |
12 |
11 |
13 |
12 |
14 |
13 |
14 + 1 IN |
Submittals
Changes
- Closed for registration on 8/12/2022