Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

MRc1 Option 3

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Barbara Clarke  on 

We have the calculations sf for our existing exterior enclosure and areas to be reused (excluding windows). How do we calculate the Exterior structure? 

0

Local utility using green power sources

NC-2009 EAc6:Green power
posted by  Emily Purcell  on 

Curious if anyone has submitted this strategy, successfully or not, or has any other insight - I took over this project after construction documentation was finished so I'm not sure what the thinki

3
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Thu Jun 6, 2019, 2:31 pm

Renewable Energy Generation

ND-v4 GIBc11:Renewable energy production
posted by  Jeff Forward  on 

This credit requires a certain percentage of renewable energy production capacity relative to annual cost.

1
Thu Jun 6, 2019, 4:08 pm
1
Sun Aug 11, 2019, 10:01 pm

Fixtures for Option 2 Lighting Quality, Strategy D.

NC-v4 EQc6:Interior lighting
posted by  Geoffrey Katz  on 

A recessed LED troffer type fixture may have an indirect light component by way of internal reflectors that reflect upward-directed light within the fixture back down onto the space below.

2
Thu May 30, 2019, 2:54 pm

ID credit purchasing lamps - Copy of a legally binding tenant sales and lease agreement documentation

CS-2009 IDc1:Innovation in Design
posted by  Edgar Arevalo  on 

So this statement is concerning, "Please note that since LEED O+M is a whole building rating system, when attempting an Innovation in Design point for following a LEED O+M prerequisite or credi

1
Fri May 31, 2019, 8:07 pm

terrazzo in a performance spec situation

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Don Jones  on 

For a project like ours, for the US Army Corps of Engineers, our specs are non-proprietary.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed May 29, 2019, 11:49 pm
3
Default Avatar
president
Gilleran Energy Management, Inc.
LEEDuser Premium Member
18 thumbs up
Wed May 29, 2019, 7:00 pm

Ending ESC Monitoring - what stage in construction?

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  David Bell  on 

Hi, I'm curious whether the USGBC/CaGBC has a generally accepted endpoint to ESC monitoring on a construction project, or whether it is left to professional judgement.    I.e.

0