Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Pilot Credit for EPDs vs. V2009 MR4 and MR5?

NC-2009 IDc1:Innovation in design
posted by  Lawrence Lile  on 

Is it allowed to persue V4 Building product disclosure and optimization - environmental product declarations as a pilot credit, under Innovation in Design,  while also persuing V2009 MR4 and M

2
Founder & Community Director
Metricorps
LEEDuser Expert
7782 thumbs up
Thu Sep 10, 2020, 11:57 pm

Extended Producer Responsibility Program - database / list?

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Cynthia Kaplan  on 

I have yet to find a comprehensive list of manufacturers offering take back programs and supporting documentation of their recycling rates, as required by GBCI.

3
Founder & Community Director
Metricorps
LEEDuser Expert
7782 thumbs up
Wed Sep 9, 2020, 2:35 pm

Is a Large Multi-Gender Restroom a "Shared Multi-Occupant Space"?

NC-v4 EQc6:Interior lighting
posted by  Douglas Flandro  on 

Does a large multi-gender restroom count as a shared multi-occupant space requiring three lighting levels?

3
Sustainability Lead
PAE Consulting Engineers
LEEDuser Basic Member
5 thumbs up
Tue Sep 8, 2020, 1:47 pm

V4.1 Acoustic Performance Calculator Password

NC-v4.1 EQc9:Acoustic Performance
posted by  John Page  on 

I filled out these Excel Workbook forms several months ago and now I cannot get access because it asks for a Password that I do not have. How can this be bypassed or a Password provided?

0

a great addition for user comfort

Pilot-Credits EQpc47:Acoustic comfort
posted by  Abbie Ford  on 

LEED for Homes seems to take a step back from user comfort compared to some of their other rating systems, and I believe this is a successful way to encourage architects to design for their user.

0

LEED O&M v4.1

LEED v4.1 Discussion Forum
posted by  Summer Gorder  on 

I am working on multiple LEED BD&C version 4 projects, but starting my first O&M project.

0

EQc6 - Interior Lights (ROS & LRV conflicts)

NC-v4 EQc6:Interior lighting
posted by  Olawale Taiwo  on 

There is quite an issue of concern on LRV weighted average calculations on our project per the EQc6 credit, as the project team requires an urgent response to this, please see details bel

1
Thu Sep 10, 2020, 4:17 pm

Is documentation of NO contract required?

Pilot-Credits SSpc129:Comprehensive Composting
posted by  Annalise Dum  on 

Hi all,

Is documentation that no contract is required from the hauler required as proof for this credit?

1
Wed Mar 24, 2021, 8:14 pm

Rainwater cleaned in a swales and drained into a nearby lake to preserve it

NC-v4 SSc4:Rainwater management
posted by  Pooja Sannamani  on 

Our project consists of a building in a waste water treatment plan (WWTP) facility.

1
Thu Sep 10, 2020, 4:45 pm

Preferred Spaces still required?

Schools-NC-v4.1 LTc8:Electric Vehicles
posted by  Brian Salazar  on 

In the new v4.1 language for Electric Vehicles, there is no mention of a preferred location as a requirement for placement of charging stations, nor infrastructure under Option 2.

1
Thu Sep 10, 2020, 12:31 pm