Greetings, Regarding IEQp1 and VRP Compliance Calculator there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several
Baseline modeling for manufacturing facility
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Markus and colleagues, There are few issues which I'd like to share, with a request for some advice related to the Baseline project modeling. The project in question is a manufacturing facility
distance between shower rooms and changing rooms
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Anastasia Makarenko on
We currently have a project LEED-CI. It's an office in which there are 4 shower rooms for 730 FTE. There are 4 floors so we have one shower room per one floor.
Several separate baseline HVAC systems on one floor.
NC-2009 EAp2:Minimum Energy Performanceposted by Nina Starynina on
Hello colleagues, I have a question from our energy modelling team. The question is about baseline HVAC systems modelling.
Densely occupied spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Markus, I'd like to ask you for your opinion and advice about applying these values following the case described below. In LEED glossary such spaces are determined as 25 people per 100 sq ft. W
Data Center systems in Baseline
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings everybody I'm modeling a datacenter at the moment and there few issues I'm wondering how to proceed. The project consists of two building adhered to each other.
Entering nonregularily occupied spaces in IEQp1 spread sheet cal
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vassil Vassilev on
Greetings, In the IEQp1 calculation form, provided by USGBC for using in LEED v4, in the Occupancy Category pull-down menu, there is nothing related to equipment rooms, non-occupied stores and sim
Data Center Baseline systems
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.
Epoxy floor. Testing laboratories
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Irina Charkina on
Hello, We have a project in Russia under LEED for CS-2009 sertification. There are technical rooms with epoxy flooring. 1) Can anybody confirm if I am wrong or right?
Floor slab on grade
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, There is an issue on applying F factor about which I'd appreciate some assistance. The F factor in general refers to the floor slab edge insulation.